美国加油排放测试标准中相关的标准.doc
《美国加油排放测试标准中相关的标准.doc》由会员分享,可在线阅读,更多相关《美国加油排放测试标准中相关的标准.doc(60页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、86.098-25Maintenance.Section 86.09825 includes text that specifies requirements that differ from 86.09425. Where a paragraph in 86.09425 is identical and applicable to 86.09825, this may be indicated by specifying the corresponding paragraph and the statement “Reserved. For guidance see 86.09425.”(a
2、)(1) Reserved. For guidance see 86.09425.(a)(2) Maintenance performed on vehicles, engines, subsystems, or components used to determine exhaust, evaporative or refueling emission deterioration factors is classified as either emission- related or non-emission-related and each of these can be classifi
3、ed as either scheduled or unscheduled. Further, some emission-related maintenance is also classified as critical emission-related maintenance.(b) introductory text through (b)(3)(vi)(D) Reserved. For guidance see 86.09425.(b)(3)(vi)(E) Evaporative and/or refueling emission canister(s).(F) Turbocharg
4、ers.(G) Carburetors.(H) Superchargers.(I) EGR System including all related filters and control valves.(J) Mechanical fillpipe seals.(b)(3)(vii)(b)(6)(i)(E) Reserved. For guidance see 86.09425.(b)(6)(i)(F) Evaporative and refueling emission control system components (excluding canister air filter). (
5、b)(6)(i)(G)(h) Reserved. For guidance see 86.09425.59 FR 16291, Apr. 6, 199486.152-98Vehicle preparation; refueling test.(a) Provide additional fittings and adapters, as required, to accommodate a fuel drain at the lowest point possible in the tank(s) as installed on the vehicle. The canister shall
6、not be removed from the vehicle, unless access to the canister in its normal location is so restricted that purging and loading can only reasonably be accomplished by removing the canister from the vehicle. Special care shall be taken during this step to avoid damage to the components and the integr
7、ity of the fuel system. A replacement canister may be temporarily installed during the soak period while the canister from the test vehicle is preconditioned. (b) Provide valving or other means to allow the venting of the refueling vapor line to the atmosphere rather than to the refueling emissions
8、canister(s) when required by this test procedure. (c) For preconditioning that involves loading the vapor collection canister(s) with butane, provide valving or other means as necessary to allow loading of the canister(s). 59 FR 16298, Apr. 6, 1994, as amended at 60 FR 43898, Aug. 23, 199586.154-98M
9、easurement procedure; refueling test.(a) The refueling test measurement procedure described in this section immediately follows the vehicle and canister preconditioning described in 86.153-98. (b) The refueling emission enclosure shall be purged for several minutes immediately prior to the test. War
10、ning: If at any time the concentration of hydrocarbons, of methanol, or of methanol and hydrocarbons exceeds 15,000 ppm C, the enclosure should be immediately purged. This concentration provides a 4:1 safety factor against the lean flammability limit. (c)(1) The FID (or HFID) hydrocarbon analyzer, a
11、nd additional analyzer, if needed, shall be zeroed and spanned immediately prior to the test. (2) For methanol-fueled vehicles only, impingers charged with known volumes of pure deionized water shall be placed in the methanol sampling system. (d) If not already on, the enclosure mixing fan and the s
12、pilled fuel mixing blower shall be turned on at this time. (e) The refueling emission measurement portion of the refueling test shall be performed as follows: (1) The line from the fuel tank(s) to the refueling emissions canister(s) shall be connected. (2) The test vehicle, with the engine shut off,
13、 shall be moved into the enclosure. The test vehicle windows and luggage compartment shall be opened if not already open. (3) An electrical ground shall be attached to the vehicle. The vehicle fuel filler cap shall be removed and the enclosure door shall be closed and sealed within two minutes of ca
14、p removal. The FID (or HFID) trace shall be allowed to stabilize. (4) The dispensed fuel temperature recording system shall be started. (5)(i) Within 10 minutes of closing and sealing the doors, analyze enclosure atmosphere for hydrocarbons and record. This is the initial (time=0 minutes) hydrocarbo
15、n concentration, CHCi, required in 86.143-96. (ii) For methanol-fueled vehicles only, measure the initial concentration of methanol as described in 86.133-96(i)(6). (6) Within one minute of obtaining the initial FID (or HFID) reading, and methanol reading if applicable, the fuel nozzle shall be inse
16、rted into the filler neck of the test vehicle, to its maximum penetration, and the refueling operation shall be started. The plane of the nozzles handle shall be approximately perpendicular to the floor of the laboratory. The fuel shall be dispensed at a temperature of 671.5 F (19.40.8 C) and at a d
17、ispensing rate of 9.80.3 gal/min (37.11.1 liter/min). In testing conducted by the Administrator, a lower dispensing rate (no lower than 4.0 gal/min (15.1 liter/min) may be used. (7)(i) Partial refueling test. If the Administrator conducts the non-integrated system partial refueling test, the fuel fl
18、ow shall continue until the amount of fuel pumped is equal to the fuel consumed during the driving, as determined in accordance with 86.153-98(d)(3). The final volume of fuel dispensed must be within one-tenth of a U.S. gallon (0.38 liter) of the targeted amount. If automatic nozzle shut-off occurs
19、prior to this point, the nozzle shall be reactivated within 15 seconds and fuel dispensing continued as needed. A minimum of 3 seconds shall elapse between any automatic shutoff and subsequent resumption of dispensing. (ii) For all other refueling tests. The fuel flow shall continue until the refuel
20、ing nozzle automatic shut-off is activated. The amount of fuel dispensed must be at least 85 percent of nominal fuel tank volume, determined to the nearest one-tenth of a U.S. gallon (0.38 liter). If automatic nozzle shut-off occurs prior to this point, the nozzle shall be reactivated within 15 seco
21、nds and fuel dispensing continued as needed. A minimum of 3 seconds shall elapse between any automatic shutoff and subsequent resumption of dispensing. Dispensing may not be manually terminated, unless the test vehicle has already clearly failed the test. (8)(i) The final reading of the evaporative
22、enclosure FID analyzer shall be taken 605 seconds following the final shut-off of fuel flow. This is the final hydrocarbon concentration, CHCf, required in 86.143-96. The elapsed time, in minutes, between the initial and final FID (or HFID) readings shall be recorded. (ii) For methanol-fueled vehicl
23、es only. Measure the final concentration of methanol as described in 86.133-96(m)(2). (9) For vehicles equipped with more than one fuel tank, the procedures described in this section shall be performed for each fuel tank. 59 FR 16299, Apr. 6, 1994, as amended at 60 FR 43898, Aug. 23, 199586.153-98Ve
24、hicle and canister preconditioning; refueling test.(a) Vehicle and canister preconditioning. Vehicles and vapor storage canisters shall be preconditioned in accordance with the preconditioning procedures for the supplemental two-diurnal evaporative emissions test specified in 86.132-96 (a) through (
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 美国 加油 排放 测试 标准 相关
限制150内