接触网零件安装_bi24045.pdf
《接触网零件安装_bi24045.pdf》由会员分享,可在线阅读,更多相关《接触网零件安装_bi24045.pdf(34页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Cantilever Structure and Registration Devices 腕臂与定位装置 page 1 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331910.doc All changes in comparison with the last revisions are marked with a vertical line at the mar
2、gin.Rev Date Prepared Date Approved Revision 2007-11-11 G.Zimmert 1 2008-01-09 Solka/Zim.2 2008-08-19 Solka update 3 2008-11-03 Solka Update out of running 4 2009-02-12 Solka Tightening torque M1 changed from 75Nm to 50Nm We reserve all rights in this document and in the information contained therei
3、n.Reproduction,use or disclosure to third parties without express authority is strictly forbidden.Balfour Beatty Rail GmbH 1.General 总则 2 2.Design and Functioning 设计与性能 4 3.Installation procedure 安装程序 5 3.1 Hinge assembly for cantilever(7)+(8)+(9)5 3.2.Stay for Steady tube(10)定位管斜拉线(10)7 3.3.Hook Cl
4、amp(11)定位环钩(11)9 3.4 Drop bracket(3+4)定位支持器(3+4)10 3.5 Installation of Steady arm(1)定位器的安装(1)10 3.6 Installation of Contact wire clamp(2)定位线夹的安装(2)11 3.6.1.Installation out of running clamp 13 3.7 Installation of wind stay 安装防风拉线(12)+(13)14 4.Control of Lifting Range of limted Steady arm 15 5.Tools
5、工具 16 6.Drawings 图纸 18 Cantilever Structure and Registration Devices 腕臂与定位装置 page 2 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331910.doc All changes in comparison with the last revisions are marked with a v
6、ertical line at the margin.Rev Date Prepared Date Approved Revision 2007-11-11 G.Zimmert 1 2008-01-09 Solka/Zim.2 2008-08-19 Solka update 3 2008-11-03 Solka Update out of running 4 2009-02-12 Solka Tightening torque M1 changed from 75Nm to 50Nm We reserve all rights in this document and in the infor
7、mation contained therein.Reproduction,use or disclosure to third parties without express authority is strictly forbidden.Balfour Beatty Rail GmbH 1.General 总则 The Cantilever Structure and the Registration devices will be preassembled in the warehouse.Some information about the Installation of the Ca
8、ntilever Strudture are described in the General Descirption Point.The importend is the manufacturing of the cantilever devices according the results of the Cantilever calculation.腕臂与定位装置应在仓库加工预配,然后现场安装。在前文的接触网一般性介绍中,对腕臂的安装已经作了描述。就腕臂结构而言,最重要的是要严格按照腕臂计算书的数值进行加工预配。For the preassembling in the warehouse
9、 special instruction and training will be organized.预配之前,还要在料库组织专门培训。These installation instructions are valid for the type and variant of the product described in drawings Point 3.本指导书用于保富铁路公司图纸第 3 条 所描述的各种零件。This installations instruction contains information about the structure and method of inst
10、allation of the product.This should be read by all persons working on,or with the product.本指导书包括所用零件的结构及安装方法,适用于所有对其加工或安装的人员。WARNING 注意事项 Use the product only for its intended purpose 本产品仅适用于设计文件所规定的目的。The use complies with the intended purpose if:用途必须与设计目的相吻合:the product is operated in accordance w
11、ith the agreed terms of delivery and the stated technical specifications,and 有关本产品的操作使用必须符合装运及技术规格书的有关条款。且 all supplied devises and special tools are used exclusively for the intended purpose and in accordance with the appropriate installation instructions.所供零件及专用工具用于安装目的并且符合安装指导书的要求。All persons per
12、forming the installation,commissioning,operation and maintenance of the product must posses qualification and experience in the following basics skills:所有执行本产品安装、调试、运营及维护的人员必须具有以下所述的资格和经验:installation methods,熟悉产品的安装方法 working in accordance with,and on the basis of drawings,识图并按图纸作业 working in accor
13、dance with the installation instructions,Cantilever Structure and Registration Devices 腕臂与定位装置 page 3 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331910.doc All changes in comparison with the last revisions a
14、re marked with a vertical line at the margin.Rev Date Prepared Date Approved Revision 2007-11-11 G.Zimmert 1 2008-01-09 Solka/Zim.2 2008-08-19 Solka update 3 2008-11-03 Solka Update out of running 4 2009-02-12 Solka Tightening torque M1 changed from 75Nm to 50Nm We reserve all rights in this documen
15、t and in the information contained therein.Reproduction,use or disclosure to third parties without express authority is strictly forbidden.Balfour Beatty Rail GmbH 按照安装指导工作 accident prevention and safety regulations,预防事故及遵守安全规则 commissioning methods and commissioning procedures,熟悉调试方法和调试步骤 first aid
16、.急救 Please refer to national regulations(EN 50110 in Europe)请参阅有关规范(欧洲 EN 50110)Cantilever Structure and Registration Devices 腕臂与定位装置 page 4 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331910.doc 2.Design and
17、 Functioning 设计与性能 Steady Device is attached to cantilever structures.One end of this device will be connected with the X-Tube of the cantilever by a eye clamp,and the other end will be connected with messenger wire support clamp by a stay wire.定位装置连接于腕臂结构上,其中一端通过定位环与斜腕臂连接,另一端用定位管吊线与承力索支撑线夹相连接。The s
18、teady arm is connected to the contact wire by a steady clamp(contact wire clamp).The steady clamp(contact wire clamp)fits to the contact wires according to Chinese standards with cross section 150 mm2.定位装置中的定位器通过定位线夹与接触线相连。定位线夹适合中国 150 mm2(正线)及 120 mm2(站线)标准截面的接触线。The limited steady device shall mee
19、t the requirement for pantograph being uplift for 200mm limit.限制定位装置满足受电弓在抬升 200mm 时的限位要求。Fig.1 图 1 Cantilever Structure and Registration Devices 腕臂与定位装置 page 5 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331
20、910.doc Fig.2 图 2 3.Installation procedure 安装程序 3.1 Hinge assembly for cantilever(7)+(8)+(9)(7)+(8)+(9)为腕臂旋转组件 Cantilever Structure and Registration Devices 腕臂与定位装置 page 6 of 34 OCS-Components Installation-and Maintenance Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL d
21、oc.no.52331910.doc Fig.3 图 3 Fig 3a Eye Clamp for Tube(7)定位环(7)Fig.3b Swivel Joint(8)旋转接头(8)Fig 3c Clevis End Fitting for Tube(9)双耳套筒(9)1.Install the eye clamp(Fig 3a)at the calculated point at the skewed cantilever tube 70 mm and adjust vertically the position of the clamp.Fasten the two nuts of th
22、e U-bolt by turning with a torque controlled spanner using also the washers.The tightening torque for every nut is 70 Nm.Check it repeatedly to keep the same fastening torque for both nuts.Cantilever Structure and Registration Devices 腕臂与定位装置 page 7 of 34 OCS-Components Installation-and Maintenance
23、Instructions 安装及维护指导 revision 04 date 2009-02-12 Project Wuhan-Guangzhou PDL doc.no.52331910.doc 把定位环(图 3a)安装在直径为 70 毫米斜腕臂管的经过计算的位置上,垂直地调整该定位环的位置。装上垫片,用力矩扳手拧紧 U 形螺栓的 2 个螺丝。螺丝的最大力矩为 70 Nm。对两个螺丝的力矩进行检查,力矩应该一致。2.Once the eye clamp is fixed to the skewed cantilever,take the swivel joint and put the ear
24、of the eye clamp between the two ears of the swivel joint.装上定位环之后,把定位环的单耳放入旋转接头的两个耳朵之间。Fix the eye clamp with the swivel joint with the pin(Fig.3b)and save with the split pin.用销钉(图 3b)固定定位环和旋转接头,然后再插上开口销。3.Put the clampbody of the swivel joint between the two ears of the clevis end fitting for tube
25、and fix the two fittings with a pin(Fig.3c)and save it with the split pin.把旋转接头的本体插入双耳套筒的两个耳朵之间,插上销钉(图.3c),然后用开口销将其锁闭 4.Install the steady tube 55 mm inside the eye end fitting and tight the two bolts with a torque controlled spanner at 75 Nm per bolt(M1)and 50 Nm per nut(M2)把直径为 55 mm 的定位管插入双耳套筒,用力