1、 Research of dragline application in Shenhua Group opencast minesABSTRACT:Dragline application is an advanced technique for opencast mining, which is integrated with mining, transportation and earth discharge. It can directly discharge the stripping earth into the earth stockyard. This technique enj
2、oys the advantage of large production capacity, cost effective and the shallow-burden opencast Mining. This article summarizes the dragline application in Heidaigou Opencast Mine, including the dragline typethe analyses of the mining parameter and cast blast technique and economic and technological
3、analyses, and also introduces the dragline application in Haerwusu Opencast Mine. The two examples witness the availability of the dragline used in Chinese opencast mines and its potential application as well.1 QUESTIONCoal is the major consumption energy in China. In recent years, the coal recovery
4、 at state-owned main coalmines, state-owned local coalmines and country coalmines in our country is 50%, 30% and 15% respectively. The recovery of our coal resource is low, for underground mining methods hold much more proportion. Why surface mining with higher recovery is not developed universally?
5、 Analysis founds that is related much to technology of surface mining .The railway transport technology was employed mainly in 60s,shovel-truck technology was developed in 80s. But shovel-truck technology has brought high production costs for a long time past because of many influence from fuel cost
6、, mining depth, working bench length, haulage distance to the dump yard, etc. Furthermore, this surface mining technology, which working bench length is no more than 1.5 km, designed capability is no more than 15 mt, is not competitive in the market, so a new surface mining technology is urgently ne
7、eded.The dragline stripping application is an advanced mining technology in the world, which integrates with three operations of digging, transport and dumping, can strip the overburden and dump at the spoil side of the mined-out area. This application is in worldwide use nowadays, for its easier mi
8、ning method, no restriction of working bench length. Centralized operation, higher efficiency and especial advantages to almost flat-bedded deposit,2 RESEARCH OF DRAGLINE APPLICATION IN ZHUNGEER COALMINEShenhua Group Zhungeer Energy Co. Ltd, is an extra-large-size comprehensive energy enterprise int
9、egrated with Heidaigou Coalmine and an integral preparation plant with an annual output of 12,000,000 tons each, a mine-mouth power plant with an installed capacity of 2100 MW and a first-degree single-track electric railway of 264 km long straight, and all facilities and equipments of the company a
10、re first-class and modern. With the development and industry reforms, the company gradually started to develop in a steadier and faster way. In order to match with requirements of the ambient electricity marketing, our company planned to expand the capability of exiting mine from 12 mt/a to 20 mt/a,
11、 then we started the dragline application research in Heidaigou Open pit since 2002. Here we take Heidaigou Opencast Coalmine as an example, mainly introduce the machine model selection, operation parameter analysis, cast blast technology and economic benefit.2.1.Availability of dragline application
12、 in Heidaigou Opencast CoalmineIn Heidaigou Opencast Coalmine, the thickness of surface soil is about 49 meters, rock layer about 56 meters and coal seam about 28.8 meters. The surface soil is to be stripped by bucket wheel excavator continuous system; rock and coal by shovel-truck system. The rock
13、layer thickness ranges from 50 to 70 meters, with a lot of fractures, hardness of the rock f= 3 5. The coal type is lignite with features of low sulfur, extra low phosphorus, medium ash and high ash fusion point; the average calorific value is 19223-22154 J/g (4588 5288 cal/g), well qualified for po
14、wer. The average thickness of the main minable coal seam (No. 6 coal seam) is 24 meters, the slope is no more than 3 5, and the hardness of coal f = 1-3.Considering the coal deposit and rock condition, cast blast and dragline application will be a very suitable stripping method for the mine. The dra
15、gline can be located at the top of the coal floor, rock above coal top floor can be dumped into the inner dump, the left rock and the top losses still employs the original mining technology2.2 Dragline stripping operationDragline can be applied in four ways. The mine chooses one of them. To make a d
16、ragline stand on the extended platform leveled by a bulldozer after blasting, and dump the overburden into the mined-out area, refer to Figure1. 2.3 Stripping parameters are defined as follows2.3.1 coal mining working bench lengthThe minimum coal mining working bench length is related to the product
17、ion scale. Coal seam thickness coal seam density and working bench advance speed, the calculation formula is detailed as below:Lmin = M/(V h r d) = 2002 mTake 2000m for easier calculation. Stripping working bench length is 2110 meters, of 1987 meters is to be done by dragline alone, of 61 meters at
18、each end walls is to be done under the assistance of other auxiliary equipments.2.3.2 Stripping working bench parametersStripping working bench parameters: the height of stripping bench is 45m, coal bench is 30m, bank width is 60 m, stripping bench slope is 75, coal bench slope is 75, inner dump ben
19、ch slope is 38, the blast drop is 31.5 m, casting factor is 0.25, coal haulage ramp width is 30 m, dumping material swell factor is 1.35, spoil height is 72.5m, average height of spoil yard is 60.8m.2.4 Plan of truck haulage in the pitWe designed two ramps at both end walls according To the features
20、 of one dragline stripping technology and tile complicated deposit conditions. In this way, the coal continuous production is guaranteed, for the: other ramp can be used when the dragline operation stops the access of one ramp.2.5 Dragline stripping stepsDragline strips overburden and exposes coal o
21、n the blasted level. While coal is dug at the right mining block, and transported by trucks from the right ramp. With the performance of stripping, some coal at left Mining block is exposed gradually, at meanwhile, the coal in the right mining block is gradually mined out, so the coal digging shall
22、be moved to left block. At this time, coal digging is performed al both blocks, and coal can be moved out by both coal ramps. When coal-digging transfers to left block completely, the coal will be moved out from left ramp. At this time, cast blast can be conducted in the right block where box cuttin
23、g is already finished. After dragline operated at left block moves to the limit of two blocks, dragline will walk from the top of blasted pile to the right block and start operation there. After dragline finishes all exposure of coal in the middle of the block, it will walk to left end wall and star
24、t next operation circle.2.6 Dragline production capability calculationa. Dragline annual production: mb. Dragline annual volume of per cubic meter of bucket capacity: c. Dragline bucket capacity: m2.7 Coal mining methodWe take the original coal mining method, that is, to expose coal over top floor o
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 文献 英文 关于 集团 露天矿 拉斗铲 应用 研究
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内