CT扩散炉培训教材(设备中英文版)--课件.ppt
《CT扩散炉培训教材(设备中英文版)--课件.ppt》由会员分享,可在线阅读,更多相关《CT扩散炉培训教材(设备中英文版)--课件.ppt(36页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、centrotherm扩散炉设备培训 equipment training of centrotherm Diffusion furnace 1PPT课件centrotherm扩散炉设备培训1PPT课件Centrotherm扩散炉的组成ALoading box 推舟部分B.TGA 有毒气体排放C.Heating furnace 加热部分D.Gas cabinet 气柜2PPT课件Centrotherm扩散炉的组成ALoading box设备 平面结构Equipment plane structure 1、CMI电脑2、Loading box上料箱3、Toxic gases 有毒气体排放4、Fu
2、rnace 炉体 5、Gas box 气源柜3PPT课件设备 平面结构Equipment plane structuLoading box上料箱 Baddle head舟头Loading wafer加栽的硅片4PPT课件Loading box上料箱 Baddle headLoaLoading box上料箱 Mechanical arm 机械臂5PPT课件Loading box上料箱 Mechanical arm Loading box 上料箱 Storage rack 1,2 存储位1、2 Paddle bearing,adjustable paddle position 碳化硅桨支座,调节桨
3、位置6PPT课件Loading box 上料箱 Storage TGA有毒气体排放quartz door石英门Door cylinder炉门气缸7PPT课件TGA有毒气体排放quartz doorDoor cylinHeating furnace炉膛1、CMS module 3、Power connection cover2、Thermocouple connection 4、Temperature sensor module 8PPT课件Heating furnace炉膛1、CMS moduleGas cabinet气源柜1、Flow meter 气体流量计2、Pneumatic valve
4、 气动阀129PPT课件Gas cabinet气源柜1、Flow meter129Cooling water inlet and water system冷却水系统Cooling to the top of the furnace body and furnace 对炉膛顶部和炉体进行冷却10PPT课件Cooling water inlet and waterThermostatic bath恒温槽On the POCL3 constant temperature process,normal temperature 20 degrees对POCL3进行恒温作用,正常工艺温度20度11PPT课
5、件Thermostatic bath恒温槽On the POCSilicon carbide paddle碳化硅桨Bearing quartz and silicon,and out of the carrier ship承载石英舟和硅片石英舟进出的载体12PPT课件Silicon carbide paddle碳化硅桨BearRange detection alarm范围检测报警器Detection of a range of whether object,avoid hit boat phenomenon,this range can be adjusted检测某个范围内是否有物体,避免出现
6、撞舟现象,些范围可进行调节13PPT课件Range detection alarm范围检测报警器D Communication Network Overview通信网络总览14PPT课件 CommunicatioHeating system加热系统15PPT课件Heating system加热系统15PPT课件Cooling system冷却系统1、Heat exchanger2、Cooling3、Shutoff valve 1、Cooling 4、Heat exchanger2、The main fan 5、Electronic devices 3、Cooling the air passa
7、ge16PPT课件Cooling system冷却系统1、Heat exchaAlarm lamp information17PPT课件Alarm lamp information17PPT课件Operation panel操作面板1operation panel 4 keyboard2Touch screen 5 touch screen button 3USB socket18PPT课件Operation panel操作面板operation pOperation panel操作面板The equipment has the following button1Stop action-All
8、 the mechanical action of loading box are stop2Loading box lighting-openclose the lamp of the loading box3Autohand manual switch-Loading and unloading of the operating system can manual operation in an open feeding box4 Allows to unlock-Press this button,to unlock the car19PPT课件Operation panel操作面板Th
9、e equipmeOperation panel操作面板1 pushbutton ABC keyboard call 4 pushbutton right mouse button2Pushbutton task change 5 pushbutton shift3Pushbutton brightnessABC keyboard call-calls upclosses the keyboard on the touchscreen,keyboard entries can be carried out directly on the touchsceen.Pushbutton task c
10、hange-changes a task windowsPushbutton brightness-press this button together with the shife button to increase the brightness of the touchscress.Pushbutton right mouse buttonopens right mouse button context menu,press this button together with the shift button to reduce the touchscreen.Pushbutton sh
11、iftcalls up the second keyboard level,push this bushbutton together with the required function button.20PPT课件Operation panel操作面板1 pushbCMI interface CMI桌面信息1System name 7 alarm close 2Date time 8 notes3Centrotherm logo and system 9 additional information Information button4Current display area in th
12、e 10 system mode Information field 11 connection state with CECGEM5System status6Loginlogout button21PPT课件CMI interface CMI桌面信息System CMI interface CMI桌面信息1Jobs 4 setup2System 5 alarms3Datslog 6 help(online help)22PPT课件CMI interface CMI桌面信息Jobs The CMI user interfaceCMI使用者桌面1Title bar 3 navigation b
13、ar2Command bar 4 information field with variable field areas 23PPT课件The CMI user interfaceCMI使用者桌简单介绍CESAR界面A brief introduction to CESAR interface上图是CESAR的界面:1.系统工艺状态 2.工艺时间状态 3.时间日期 4.气体流量状态 5.系统准备状态 6.温度检测显示This is a CESAR interface:1.System process 2.Process time 3.Time and date 4.Gas flow state
14、 5.System readiness 6.Temperature detection and display24PPT课件简单介绍CESAR界面A brief introductiCT操作注意事项CT operation matters needing attention1.SLS1.SLS处处于于“UPUP”位置位置时时,管,管内内有舟有舟时时不可手不可手动进桨动进桨 SLS in the UP position,the inner tube has a boat can not be manually into the paddle.2.SLS2.SLS处处于于“DOWNDOWN”位置位
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CT 扩散 培训教材 设备 中英文 课件
限制150内