中国铁路中国铁路发现 (8).ppt
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《中国铁路中国铁路发现 (8).ppt》由会员分享,可在线阅读,更多相关《中国铁路中国铁路发现 (8).ppt(10页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、CWR Track and New Type Sub-rail FoundationCWR Track and New Type Sub-rail FoundationCWR tracksTemperature stress typeTemperature stress relieving typeCWR Track and New Type Sub-rail FoundationTemperature stress typeNon-breathing zone:The inextensible part in the middle of a long rail,which shall be
2、not less than 50m longBreathing zone:The part at each end of a long rail extending/contracting in a certain range along with the change of rail temperature,which is typically 50-100m longBuffer zone:The part consisting of 2-4 standard rails or factory-made shortened rails,and serving as a transition
3、 section connected with the next long rail or turnoutWelded long railWelded long railNon-breathing zoneNon-breathing zoneBreathing zoneBreathing zoneBuffer zoneCWR Track and New Type Sub-rail FoundationTemperature stress relieving type CWR tracksAutomatic relieving typeRegular relieving typeCWR Trac
4、k and New Type Sub-rail FoundationAutomatic relieving typeMainly used for super major bridgesWith the temperature expansion joints at both ends of the rail bar,for relieving the temperature stress from time to timePreventing the pier and abutment from bearing large temperature stressCWR Track and Ne
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 中国铁路中国铁路发现 8 中国 铁路 发现
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内