1、Section 1 Construction Safety Technical MeasuresChapter 8 Engineering Project Safety and Environmental ManagementAt 8:20 on December 29,2014,the raft foundation steel system collapsed while the operators were binding steel bars in the foundation pit,resulting in 10 deaths and 4 injuries at the const
2、ruction site of the gymnasium and dormitory of affiliated middle school of Tsinghua University in Haidian District,Beijing.The Major Safety Accident of the 12.29 Steel Bar System Collapse at the Affiliated Middle School of Tsinghua UniversityThe direct cause it was failure to pile up materials,make
3、and arrange horse stools in accordance with the plan requirements,as well as the horse stool and the steel bars did not form a complete structural system,resulting in the overall collapse of the foundation floor steel bars.https:/ (Its 3 minutes and 40-49 seconds in the video.)Make this effectIII.Ca
4、use and Essence of the AccidentUse iron wire to tie the cross reinforcing bars tightlyThe Indirect Cause They are lack of construction site management,long-term absence of the manager in charge of project filing,insufficient staffing of full-time security officers,chaotic operation and management,an
5、d inadequate project supervision.Why arent Why arent any security any security guards?guards?(II)The Indirect Causen1.Lack of Construction Site Management1、Lack of Technical Disclosure2、Inadequate Safety Training3、Lack of Management,Blindly Rushing the Construction Period and Lifting.2、Long-term Abs
6、ence of the Manager in Charge of Project Filing,Insufficient Staffing of Full-time Security officersThe manager responsible for project filing does not work well.UnchangedThere are not enough full-time security officers,and the number of full-time security officers should be no less than 2 in 10,000
7、-50,000 square meters.3.Chaotic Operation and Management1、Non-employee contractors2、Lack of professional management on siten4 4.Inadequate Project Supervision5 5.The supervision and inspection of the industry management department does not work well.The accident investigation team determined that th