电力专业专业外语精选文档.ppt
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《电力专业专业外语精选文档.ppt》由会员分享,可在线阅读,更多相关《电力专业专业外语精选文档.ppt(23页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、电力专业专业外语课件本讲稿第一页,共二十三页Chap.1 Electric Power Systemsload light,motor,heaterstation v.值守、值班Words and Expressions(B)power station,power plant 电站、电厂 base load power station 基本负荷电站(厂)peak load power station 尖峰负荷电站(厂)thermal power station 热力发电站(厂)conventional thermal power station 火力发电站(厂)本讲稿第二页,共二十三页Chap
2、.1 Electric Power Systemscombined heat and power 热电联产heating power station 供热电站(厂)combined cycle power station 联合循环电站nuclear(thermal)power station 核电站(厂)Notes1.It may be water in a pond at an elevation above the generating station.本讲稿第三页,共二十三页Chap.1 Electric Power Systems2.The prime mover may be a s
3、team-driven turbine,a hydraulic turbine or water wheel,or an internal combustion engine.Each one of these prime movers has the ability to convert energy in the form of heat,falling water,or fuel into rotation of a shaft,which in turn will drive the generator.本讲稿第四页,共二十三页Chap.1 Electric Power Systems
4、3.The control system functions to keep the speed of the machines substantially constant and the voltage within prescribed limits,even through the load may change.本讲稿第五页,共二十三页Chap.1 Electric Power Systems4.To meet these load conditions,it is necessary for fuel input to change,for the prime mover inpu
5、t to vary,and for the torque on the shaft from the prime mover to the generator to change in order that the generator may be kept at constant speed.本讲稿第六页,共二十三页Chap.1 Electric Power Systems5.In a modern station,the control system is a servomechanism that senses a generator output conditions and auto
6、matically makes the necessary changes in energy input and field current to hold the electrical output within certain specifications.本讲稿第七页,共二十三页Chap.1 Electric Power SystemsPart 2 More Complicated System Words and Expressions(A)high voltage linetransmission line overhead lineunderground cable transf
7、ormercircuit breakeroutage本讲稿第八页,共二十三页Chap.1 Electric Power Systemsschedule n.计划 v.排定、安排ahead of schedule 提前behind schedule 落后on schedule 准时scheduled maintenance 计划检修switch out(off)本讲稿第九页,共二十三页Chap.1 Electric Power SystemsWords and Expressions(B)busbar 母线(排)main busbar 工作母线reserve busbar 备用母线transfe
8、r busbar 旁路母线 rigid busbar 硬母线flexible busbar 软母线double busbar 双母线triple busbar 三母线feeder circuit-breaker 馈线断路器bus coupler circuit-breaker 母联断路器 本讲稿第十页,共二十三页Chap.1 Electric Power SystemsNotes1.For the same power,the higher-voltage line carries less current,has lower losses for the same wire size,and
9、 provides more stable voltage.2.Additional system load may require more power than the generator can supply.本讲稿第十一页,共二十三页Chap.1 Electric Power Systems3.The above system may be vastly improved by the introduction of circuit breakers,which may be opened and closed as needed.4.If possible,outages of eq
10、uipment are scheduled at times when load requirement are below normal.本讲稿第十二页,共二十三页Chap.1 Electric Power SystemsPart 3 Typical System LayoutWords and Expressions(A)the radial systemthe loop system the network systeminterruption of powerto be removed from servicedistribution circuit interconnection本讲
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电力 专业 外语 精选 文档
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内