1、Chapter 7 Cost control of project constructionlecture 1 Method of construction cost analysisnBased on the traditional deviation analysis,earned value analysis introduces an intermediate variable earned value to analyze the project schedule and cost.n Earned value quantifies work and work progress in
2、to value,enabling managers to objectively and accurately calculate the percentage of work completed.nBy measuring and calculating the budget cost of the completed work,the actual cost of the completed work and the budget cost of the planned work,the progress and cost variation of the implementation
3、of the plan can be obtained,so as to achieve the purpose of judging the project schedule and cost plan.Cost control method-Earned Value AnalysisEarned Value Analysis(EVA)Cost control method Cost control method-Earned Value Analysisthe three parameters of the earned value analysisBCWP(Budgeted Cost f
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑工程项目管理教程 15 建筑工程 项目 管理 教程 15
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内