《新整理施工方案》悬臂梁施工工艺流程.doc
《《新整理施工方案》悬臂梁施工工艺流程.doc》由会员分享,可在线阅读,更多相关《《新整理施工方案》悬臂梁施工工艺流程.doc(1页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Construction Workmanship Flow Chart for Cantilever BeamPrecast 2#(2#) beam bottom web reinforcement supportPrecasted reinforcement centering of 0#.1#.1# beamMoving inner support, installing 2#.2# beam and top plate steelSurvey elevation after grouting concreteSurvey elevation of observed point befor
2、e extensionSurrey elevation of observed pointbefor grouting concreteMaking traveling corriages, assemble and surveyLeveling top surface of 2#. 2# beamRemoving traveling carriagesHanged grouting 3#(3#-n#(n#) beamAdjust 3#. 3# beam construction clevation of setting up formsSurvey elevey elevation afte
3、r tensioningTensioning and groutingCuring and protectingSide span straight lint constructionSymmetrily grouting concrete for 2#.2#beamHanged 2#. 2# beam.WebreinforcemantInstallingGrouting 0#. 1#. 1# beam insideErecting permanent temporary bearingLeveling top surface of 0#. 1#. 1# beamSetting up support meat the powerFoundation and pier body construction
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 新整理施工方案 整理 施工 方案 悬臂梁 施工工艺 流程
限制150内