1、Discuss the construction temperature and crack of the concrete lightlyBy G. K. Kululanga, W. Kuotcha, R. McCaffer, Member, ASCE, and F. Edum-FotweThe summary: In order to prevent the owners of the concrete work of claims, we must do a good job in the construction process in the temperature and crack
2、 control,through observation live for many years, through consulting the monograph about stress within the concrete, explain to concrete temperature reason, on-the-spot concrete control and measure , prevention of crack of temperature that crack produce. Keyword :Concrete Temperature stress Crack Co
3、ntrol The concrete occupies the important position in modern engineering construction. But today, the crack of the concrete is comparatively general, the cracks are nearly omnipresent in the science of bridge building. Though we take various kinds of measures in constructing, careful, but the crack
4、still occurs now and then. Tracing it to its cause, it is one of them incompletely that our change to concrete temperature stress pays attention to. In the large volume concrete, temperature stress and temperature control are significant. This is mainly because of the reason of two respects. First o
5、f all, concrete often appear the temperature crack in not constructing, influence the globality and durability of the structure. Secondly, in the course of operating, the temperature change has remarkable influence that cant be ignored on the stress state of the structure. We meet to construct tempe
6、rature crack in mainly, so only to origin cause of formation and treatment measure, concrete of crack make a discussion in constructing this text. 1、Reason of a crack Have many kinds of reasons to produce the crack in the concrete, it is mainly the changes of temperature and humidity, fragility and
7、disparity of the concrete, and the structure is unreasonable, the raw materials is not up to standard (if the alkali aggregate react), the template is out of shape, the foundation does not subside etc. evenly. The cement emits a large amount of heat of hydration when the concrete is hardenned, insid
8、e temperature is rising constantly, cause the stress of drawing on the surface. In the course of lowering the temperature , is it congeal foundation pay restrain to mix always later stage, will present the stress of drawing within the concrete . Reducing of temperature can surface cause heavy stress
9、 of drawing very in concrete too. When these draw the stress and go beyond resisting the ability of splitting of concrete , namely will present the crack . A lot of inside humidity of concrete change very light or change relatively slow, surface humidity might change heavy the violent change takes p
10、lacing. Such as maintaining thoroughly, when getting wetter when not doing,contract surface there arent deformation doing, often cause the crack too. The concrete is a kind of fragility material , tensile strength is about 1/10 of the compression strength, is it carry on ones shoulder or back limit
11、when draw out of shape to have *104 only , is it carry on ones shoulder or back limit location when stretch out of shape to there is *104 to add for a long time to add a short time. Because raw materials even, water dust than unstable, transport and build phenomenon of emanating of course, its tensi
12、le strength is not even in the same concrete, a lot of resist the ability of drawing very low, it is apt to present the weak position of the crack. Among armored concrete , draw stress to undertake by reinforcing bar mainly , concrete bear stress of keeping just. Or reinforcing bar mix if edge posit
13、ion gone to to congeal present the stress of drawing in the structure in plain concrete, must rely on the concrete oneself to bear . Require to avoid the stress of drawing or only very small stress of drawing appears of the the general design. But the concrete is cooled from maximum temperature to t
14、he steady temperature of operating period in constructing, often cause sizable to draw the stress within the concrete. The temperature stress can exceed other outsides and load the stresses caused sometimes, know change law, temperature of stress for carry on reasonable structural design and constru
15、ct extremely important. 2、Analysis of temperature stresses Can be divided into following three stages according to the forming process of the temperature stress: (1)It is early: Build concrete is it is it over basically to send out heat to cement to begin , generally one one day by oneself. Two char
16、acteristics at this stage, first, the cement emits a large amount of heat of hydration, second , mix and congeal the changing sharply of elastic model quantity. Because of the change of elastic model quantity , form the remaining stress in the concrete in this period. (2)Middle period: Up till the c
17、oncrete is cooled until stability temperature from cement send out heat function basically when expiring, in this period, the temperature stress is mainly because the cooling of the concrete and external temperature change cause, these stresses and remnants stresses that is formed in early days are
18、superposed , mix and congeal the elastic mould amount that goes to and does not change much during this period. (3)Later period: Operation period after the complete cooling of concrete. Temperature stress whether external temperature change cause mainly, these stresses and first two kinds of remnant
19、s stresseses are changed and added . Can be divided into two kinds according to the reason why the temperature stress causes: (1)Spontaneous stress: There are not any restraint or totally static structure at the border, if inside temperature is non-linear distribution, temperature stress appearing b
20、ecause structure restrains from each other. For example, the body of mound of the bridge, the physical dimension is relatively large, surface temperature is low when the concrete is cooled, inside temperature is high, present the stress of drawing on the surface, present the stress of pressing in th
21、e middle. (2)Restrain the stress: All of the structure ones or it restrain external one some border, cant out of shape and stress not cause not free. Such as case roof beam roof concrete and guardrail concrete. This two kinds of temperature stresses draw back stresses caused to act on with the doing
22、 of concrete together frequently. It is a more complicated job to want to analyse the distribution , size of the temperature stress accurately according to known temperature. In case of great majority , need to rely on the model test or the number value to calculate. To is it make temperature stress
23、 have sizable limp to creep concrete, at the stress accounting temperature, must consider the influence that creep , calculate concretly that no longer states thinly here. 3、Control and preventing the measure of the crack of 3 temperature For prevent crack , lighten temperature stress can from contr
24、ol temperature and is it is it set about to restrain terms from two to improve. The measure of controlling temperature is as follows: (1)Is it improve aggregate grade mix , is it do rigid concrete to spend , mix mixture to adopt, is it guide angry pharmaceutical or plastification pharmaceutical ,etc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 新整理施工方案 整理 施工 方案 英文翻译 _secret
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内