《新整理施工方案大全》外文资料_secret.doc
《《新整理施工方案大全》外文资料_secret.doc》由会员分享,可在线阅读,更多相关《《新整理施工方案大全》外文资料_secret.doc(5页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Fixed price traditional model and the bidding price with Bill of quantities Analysis First, the traditional mode of fixed Price To clarify implementation of the project tender offer the bills of quantity the inevitability of the new model and the design ideas, we first of the traditional fixed Price
2、 mode. Fixed Price traditional model is based on the mandatory pricing mode, in essence the content, the price of unity is from the manifestations, is a direct fixed costs, and based on the direct costs, multiplied by the various cost items rates that other costs, component engineering cost. Its cha
3、racteristics can be attributed to the following aspects: 1. Fixed Price traditional patterns of price formation mechanism do not reflect the true cost of enterprise level. Price in the traditional mode, the tender enterprises on construction plans the unit works under the fixed part of the sub-proje
4、cts in the works, multiplied by the corresponding labor, materials, machinery priced, aggregated together by engineering unit labor costs, the cost of materials and machinery costss and, coupled with the rates in accordance with the regulations and by other direct costs, the scene of indirect costs,
5、 profits and tax plan, a unit of Price. Because the tender offer is on the same scale, the same calculation and drawing sets prices, therefore, if all the bidders are calculated according to the correct documentation requirements, Price will be the same. Instead, offer a difference between merely du
6、e to the bidders in terms of accuracy of inconsistencies and none other varying degrees, they simply could not tender units of the construction, technology and management level, which may not necessarily offer a true low-cost enterprise. 2. As a price for the underlying core business added that the
7、traditional model of fixed Price also considered by the funds, equipment, technology, power, construction plan, and other non-price factors constitute the technical standard. But for the evaluation of non-price factors main concern Time and quality control as well as the associated security measures
8、, such as the construction programmer with the tender and the terms of the enterprise, and not enough attention, the various enterprises of the technical indicators are often similar, there is no competitive. 3. Fixed Price traditional mode of the principles and methods of evaluation form is not con
9、ducive to the survival of the fittest, and market environment for fair competition. Fixed Price in the traditional mode, the evaluation often is the price and non-price factors comprehensive evaluation process, and non-price factors and the price is often the weights according to a certain proportio
10、n. However, due to non-price factors tender similar enterprises, and can not truly reflect the various enterprises in the management, quality, cost control, the true level, so that even non-price factors in the comprehensive evaluation process occupies a higher weight, and its role is very limited ,
11、 and whether a decision on the successful bidder is the role of the price factor. Bidding on the reasonableness of the assessment are three ways: First, there are basic price assessment methods, and the second is no way Nonpre assessment, and the third is Nonpre composite assessment methods. Accredi
12、tation means a basic price is a pre-determined price for the basic price criteria that the bidding price at the nearest Price (or less than a certain percentage Nonpre) the most reasonable, the higher the score in the evaluation process, often marked clearly defined Price on the basis of the upset b
13、y allowing the reduction rate (+3% and a 5%), exceeding the floating range of the tender was regarded as Felicia. Thus, the competitive bidding has become a guess superscript competition; he gave into the basic price information warfare, but could not deliver on the survival of the fittest and fair
14、competition. No Base Price assessment method is not pre-determined price bidding price, but in order to evaluate the merits of Price, Price used released from a maximum and a minimum Price, the remaining will be determined from the average of an evaluation base, and with a basic price as the tender
15、set an effective range beyond the effective range as Price Feibiao. Thus, high management standards, advanced means of production costs low so low tender offer enterprises, may be the low bid Strike derived from the average or even be eliminated beyond the effective range, and has a moderate to high
16、 tender This is also not good choices bidders purposes. Accreditation is the way of bidding price will be prepared by the Base Price owners of the tender price and average people were empowered to offer (such as 60% and 40%) calculated as a weighted average assessment base, given the creation of an
17、effective sub-interval. Such methods of assessment and the way these two similar defects. 4. Traditional fixed under the Price mode often is in terms of the contract price for the base configuration, and the method is generally set in the convention industry, whether it is worth explore scientific a
18、nd reasonable. Second, the bills of quantity Price advantages Price different with the traditional model, the bills of quantity Price model is based on the market valuation models, and valuation basis, the implementation of the price of separation principle. The way in the management and the impleme
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 新整理施工方案大全 整理 施工 方案 大全 外文 资料 _secret
限制150内