1、Load-oriented manufacturing control just-in-time production for job shopsProduction Planning&Control1994 V ol.5.Wolfgang BechteHannover consultant firm1998/08/18 IntroductionA technique for job shops supporting the JIT concept-Using load-oriented order release,entry(Bechte,Kettner 1980)-Manufacturin
2、g control system is designed by Krautzig.-Implemented in many factories(Wiendahl,Bechte 19871991)Basic principles&technique for Load-oriented manufacturing control Detailed computational procedure refer to more theoretical publication written by Wiendahl(1993),Bechte(1988)content1.Objectives of load
3、-oriented manufacturing control2.Structure of load-oriented manufacturing control3.Basic concept in load-oriented manufacturing control4.Overview of a load-oriented manufacturing control system5.Example of the control system1.Objectives of load-oriented manufacturing controlReducing lead-time and WI
4、P.Keeping actual lead-time on stable lowest possible level.-Permanently In/Out put,inventory and average lead time of W/C are monitored and compared with their planned values in dynamic wayAt the same time determine Bottlenecks,short&mid-term capacity planningFurnishing realistic due-date scheduling
5、 and capacity planning2.Structure of load-oriented manufacturing controlFlow of orders for one single machineIllustrating events,a hierarchical controller levels,sectionsFigure 1.Funnel model of job shopMulti-level closed-loop control systemHigher controller level depends on theperformance of the lo
6、wer one.CompanyDISPOSITIONJob ShopMachineSalesDue DateLead timeUtilizationMfg.AssemblyReceiving Shipping Supplier CustomerDisturbancesProd ScheduleLong Term CapacitiesOrder EntryMid termCapacitiesOrder releaseShort termCapacitiesOperation SequencesCapacities LoadingFigure2.Multilevel closed-loop con
7、trol system.3.Basic concept in load-oriented manufacturing control3.1 Basic relationship at a Work centerFour simple rules for regulating Input,Output,Inventory and Lead time1)constant inventory-keep In/Output the same on a avg.2)changing inventory-change input3)Average lead time-adjust In/Out ratio
8、4)Individual lead time to be even-apply FIFO rule while dispatchingAvg.lead time=Avg.Inv.Avg.OutputQueuing ordersAvg.OutputAvg.InputAvg.InventoryInputInitialInventoryAvg.Lead timeAvg.InventoryOutput curveInput curveOutputFinal InventoryControl PeriodLoadHoursTimedaysCompleted OrdersArriving OrdersFi
9、gure 3.Basic relationship and throughput diagramBasic relationship at work center to plan the Input,Output,Inventory and Lead timeload limit=Planned output*(Planned lead time+Planning period)Planning period3.Basic concept in load-oriented manufacturing control3.2 Principle of Load limiting and Load
10、conversionAdding LoadRemainingLoadLoadlimitPlannedInputActualInventoryPlannedlead timeCase A case BTodayPlanning PeriodPlanned Inv.(Buffer)Plannedoutput(capacity)Figure4.Load limiting.In case that exceeding loads happensLoad limiting reject or prefer orders or variesRequired capacity=present load*pl
11、anning periodplanned lead time+planning periodRejectedLoadAllowedloadLoadlimitExceeding loadPresent LoadPlannedlead timeRequiredBufferRequiredcapacityFigure5.Short-term capacity planning using the load limitRequired Input CurveRequiredoutput curve.Order release should consider the work center loads
12、and capacitiesFour type of loads In case of B,D a statistical estimation is needed;Load conversion factordepreciation factor=planned output/Load limit=planning periodplanned lead time+planning periodLimiting and balance work in process by order release.Planned Inv.(I)(D)LoadlimitPlannedlead timeToda