1、 中国地质大学长城学院本科毕业论文外文资料翻译系 别: 管理科学与工程系 专 业: 工程管理 姓 名: 学 号: 02611539 2015 年 03月 03日外文原文Project Tracking Audit2014 -management for development series Tracking Audit.Joseph DuranWith the rapid development of Chinas socialist market economy, the continuous improvement of peoples living standards, increasi
2、ng social demand for the protection of sound and fast economic development, the state has increased its investment in infrastructure, in order to meet the social power increased demand for power plants as an infrastructure is constantly built. However, at all stages of the construction process of th
3、e plant, the functional departments will inevitably occur operations are not standardized, improper use of funds and other violations of trade regulations, to circumvent or minimize the phenomenon of violations occur, we need construction audit tracking.1 Project Tracking AuditConstruction project t
4、racking audit refers to an independent audit institutions and auditors (including the trial of the Association with the audit department of social agencies and professionals) use of audit techniques, in accordance with relevant national laws, regulations and rules and norms, from an investment proje
5、ct for construction projects completion of delivery to the various stages of economic management activities real, legitimate, benefits review, monitoring, analysis and evaluation process. The purpose is to effectively control and a true reflection of the project cost, and safeguard the legitimate ri
6、ghts and interests, improve construction project management, and improve investment efficiency.2 Project Tracking Audit Main ContentConstruction phase of the project is the construction of the entire project during the longest time span, the largest change in phase. To this end the following aspects
7、 from the audit and control:Mixed involved in the construction drawings.Understand construction drawings to change the situation, be aware of, and drawings joint hearing to assess the cost of content, for which made reference to the views irrational content.l For construction design evaluation.On on
8、e of the major construction program for economic analysis, to see whether the organizational problems due to construction project cost increased content, and some of the construction schedule, process, plan to make reasonable suggestions to further optimize the construction design.l Progress payment
9、 payment control.According to the progress of measurement engineering, progress payments paid to participate in the project control, progress payment audits to assist owners and visa in time to the project owners report the use of funds.Audit and Control engineering design changes.Engineering design
10、 changes to be proposed measurement and assessment, analysis of the impact of design changes proposed cost, multi-protocol changes from preferred a practical, most economical and reasonable changes to the program, and estimates the cost of design changes may be caused by the increase or decrease; cl
11、osely with the owners and supervision units to minimize design changes occur, and where changes occur in the construction, but also in construction before the change, in order to avoid the occurrence of an event of a claim; to design changes and major site supervision Matters record and briefly stat
12、ed the cause of the change, background, change the time produced, participants, project location, proposed units. Provide detailed and reliable information on completion of settlement; implementation of design changes track; analysis of the design changes to the responsible party accountablel Single
13、 visa for the project be measured and evaluationTo ensure timely visa hidden works, timely measurement, timely assessment, the owner promptly drew attention in the construction process, we will send specialized personnel to go to the site, to fully grasp the project live, check the hidden figure, co
14、ncealment acceptance records. Check whether the covert project visa by design units, supervision units, construction units and other relevant personnel to the scene acceptance signature until formalities complete, engineering and as-built drawings included in the settlement agreement before. While c
15、onstruction of visa do you calculate the corresponding effort to avoid disputes afterwards. Provide inquiry service for major materials procurement. After completion of the project in accordance with the trust of the owners, I will organize a review team to the completion of settlement construction
16、raised by audit and issue audit reports.3 Construction Project Management Tracking Audit RoleTracking audit runs through the whole process of construction, which is reflected in the project feasibility study, preparation of audit the estimates, bidding to design drawings comparative economic rationa
17、lity, preparation of construction drawing budget, project, construction of the design contract terms of the contract review and tentative pricing or armor for material (equipment) inquiry bidding, design changes and economic engineering review visa metering, metering project progress payments audit,
18、 on preliminary engineering and much more settled, all the required determine the cost of the project, control, supervision and management of the entire process. After the settlement is to audit before, during, an extension of the whole process of auditing methods, so that the whole project implemen
19、tation in a controlled state, can effectively overcome the limitations of post-supervision.Strengthening the design and drawings economically rational argument comparing the design phase. Tracking audit unit shall assist the construction unit costs low, while focusing on the design, the design of th
20、e unit design, drawings demonstrate whether the economy is reasonable, good control of the project cost from the design source.To focus on BOQ preparation of the tender price control review, while the project tender documents, the relevant provisions of the construction contract cost audit should fo