1、Section 2 Project ClaimChapter 9 Project Contract Managementconstruction period claimexpense claim1 The calculation methods of construction period claimThe direct methodThe proportional analysis methodThe network analysis method 1.The direct methodnSome incidents happened during the construction of
2、a project:from May 20 to May 26,the project was shut down due to the failure of the contractors construction equipment,and from May 24 to June 9,the project was also stopped due to the delayed delivery of drawings of the owner.How many days can the contractor claim for the construction period?nThe f
3、ailure of the construction equipment is the responsibility of the contractor,so the contractor is not entitled to claim compensation from May 20 to May 26.The delayed delivery of drawings is the responsibility of the owner,and the contractor is entitled to claim for the construction period,which is
4、14 days in total from May 27 to June 9.2.The proportional analysis methodAn accident occurred in the foundation construction of a project,resulting in the increase of project quantities from the original 2800m to 3500m,and the original construction period is 40 days,then how many construction days t
5、he contractor can claim for?Claim value of the construction period=original construction period the quantity of new work/the original work quantity=40(3500-2800)/2800=10 daysThe claim value of the construction period=the contract construction period the quantity of new work(or the cost of new work)/
6、the quantity of the project(the contract price)Critical workNon-critical workthe delay time shall be equal to the claimed construction periodBecome the critical workStill remains the non-critical workThe delayedworkthe delay time-the total time differencedoes not exist the claims for the constructio
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑工程项目管理教程 19 建筑工程 项目 管理 教程 19
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内