煤矿机电管理制度本科论文.doc
《煤矿机电管理制度本科论文.doc》由会员分享,可在线阅读,更多相关《煤矿机电管理制度本科论文.doc(67页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt . (2) power co
2、rd into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the
3、box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from
4、 the power, illumination, welding. 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber
5、 cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up,
6、 switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wi
7、re, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the black or green/Huang Shuang-color line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line co
8、nstruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15m
9、A/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof s
10、heds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)problems that canno
11、t be ignored. Some leaders unwilling to do masses work, masses concept weak, on masses feelings not deep, pendulum not are with masses of relationship, think masses work is revolutionary war era of things, now obsolete has, buried business work, ignored masses work of situation compared General; som
12、e leaders not do masses work, old method regardless of with, new not with, not understand masses psychological, not understand masses wishes, not said masses language, work method simple stiff, caused masses of conflict and antipathy; some leaders cant do masses work, Faced with a lot of contradicti
13、ons among the people worry about fear, panic set in encounter group events, and some are even mismanaged, inflame, so work has suffered heavy losses, and so on. These problems we are soberly aware, enhancing the partys ruling capability, the maintenance and development of the partys advanced nature
14、and purity, and to enhance the ability of party committees and leading cadres are good people. Attach great importance to and is good at doing mass work, has become the new urgent situation strengthening the partys governing capacity-building tasks. Combined practice of maintaining flesh-and-blood t
15、ies with the masses, urged the broad masses of party members and cadres, especially all levels . Processing to improve as a guide to the country. What I did is summed up these new things, be promoted. This is a vivid manifestation of the Deng Xiaopings mass. Deng also put people support does not sup
16、port, agreed not to agree, happy happy, promise not to promise as a starting point and destination of developing guidelines, policies, and as the only standard for measuring compliance with the wishes of the masses of the people. Under the guidance of Deng Xiaoping theory, Central Government adopted
17、 a series of important measures to strengthen links with the masses. In December 1989, the CPC Central Committee made on adhering to and perfecting the system of multi-party cooperation and political consultation under the leadership of the Chinese Communist Party, closely for CPC and the democratic
18、 parties and the relationship between the part of the masses that they contact, effectively carrying out the mass line, played a positive role. In March 1990, the 13 plenary session adopted the decision on strengthening contacts with the masses of the Party noted that created and developed in the lo
19、ng struggle of the partys mass line, is to realize the partys ideological line, the fundamental political and organizational work route, can always maintain flesh-and-blood ties and development of the masses, is directly related to the rise and fall of the rise and fall of the party and State. In Se
20、ptember 1994, 14 adopted by the plenary session of the Party on strengthening decision on several major issues of party building. The requirements of the decision of the partys leading bodies and leading cadres should develop a democratic style of work, come from the masses, to the masses, together,
21、 stick to the mass line. Party of 13 session four in the plenary yihou, to Jiang comrade for core of party山西雄山煤业有限公司 机电管理制度一、机电管理制度总则41、机电组织机构:42、防爆设备入井检查制度53、矿用输送机胶带管理制度54、设备包机制度65、设备运行维护保养制度66、机电事故追查分析制度67、设备安装验收制度78、设备定期检修制度89、电气试验制度810、干部上岗查岗制度911、电缆管理制度912、小型电器管理制度1013、润滑制度1014、油脂管理制度1115、安全活动制
22、度1116、机电配件管理制度1117、设备的年度更新改造有关规定1218、设备管理制度1219、机电操作规程管理制度1520、杂散电流管理制度1621、设备、技术档案管理制度1622、井下机电运行管理1723、设备报废制度1924、设备检验登记管理制度1925、停送电管理制度2026、机电科管理人员下井检查管理制度2027、井下电器设备的维修制度2128、井(上)下电缆敷设管理规定2329、预防雷电安全管理制度24二、绞车房管理制度251、交接班制度252、副井提升绞车司机安全操作规程253、主井提升绞车司机安全操作规程264、绞车房设备包机制265、设备维修保养制度276、绞车司机岗位责任制
23、277、绞车司机巡回检查制度278、要害场所管理制度289、2JK-31.5提升绞车电控系统图2910、提升绞车电控系统图2911、TH102液压站原理图3012、盘形制动器结构图3113、提升绞车制动系统图33三、主提升皮带管理制度341、主皮带运输机司机岗位责任制342、皮带维修工岗位责任制343、主皮带司机交接班制度354、主提升皮带司机安全技术操作规程355、胶带输送机维修工安全技术操作规程366、主提升皮带巡回检查制377、要害场所管理制度378、定期维护保养制379、设备包机制3810、事故分析制3811、皮带输送机安全使用规定38四、风井管理制度391、 交接班制度392、主扇司
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿 机电 管理制度 本科 论文
限制150内