仪表施工方案方案优质资料.doc
《仪表施工方案方案优质资料.doc》由会员分享,可在线阅读,更多相关《仪表施工方案方案优质资料.doc(95页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、仪表施工方案方案优质资料(可以直接使用,可编辑 优质资料,欢迎下载)编号:15-06部-Stepan-SHF-601The 50,000t/apolyester polyolprojectof Stepan (Nanjing) Chemical Co., Ltd.斯泰潘(南京)5万吨/年聚酯多元醇项目仪表施工方案Instrument Construction Plan编制Prepare by: 安全Securityby: 审核Review by: 批准Approve by: Nanjing Chemical Construction Co., Lid南京南化建设13. Mar. 2021目 录
2、Contents第一章工程概况GENERAL.3第二章:编制依据 CHAPTER 2- REFERENCE.3第三章:仪表实物工作量 CHAPTER 3- INSTRUMENTQUANTITY OF WORK.3第四章:施工的主要程序 CHAPTER 4-MAIN CONSTRUCTION PROCEDURE.4第五章:主要施工方法和技术要求 CHAPTER 5-CONSTRUCTION TECHNICAL REQUIRES AND QUALITY STANDARD.7第六章:质量控制和检、试验计划 CHAPTER 6-QUALITY CONTROL AND INSPECTION TEST P
3、LAN.29第七章:主要施工机具CHAPTER 7-MANPOWER.34第八章:劳动力组织CHAPTER 8-LABOR ORGANIZATION.34第九章:施工进度计划CHAPTER 9-CONSTRUCTION PROGRESS SCHEDULE.35第十章:安全保证措施、JHA及文明施工 CHAPTER FIVE SAFETY ASSURANCE SYSTEM, JHA AND HOUSEKEEPING .37第一章:工程概况 Chapter 1-General本工程为斯泰潘(南京)化学新建5万吨/年聚酯多元醇项目,工程范围主要包括:行政办公和电控楼,空压站、门卫和称重,焚烧炉,冷却
4、水系统,消防泵房,事故水池,工艺装置区,仓储区等。This is an expansion project of BASF-YPC Company Limited, the management team is IET, TAR work involved in area 1 mainly includes existing instrument exchanges, remove, and resetting, new instrument installation, cable tray laying and cable pulling. 仪表种类主要有:控制阀、开关阀、流量计、差压变送器
5、、压力变送器、温度变送器、分析仪表、气体检测仪等仪表。Various instruments covered like control valve, on-off valve, integrated flow meter, DP transmitter, pressure and temperature transmitter, fork liquid level switch and toxic gas detector. 第二章:编制依据 Chapter 2- Reference招标文件自动化仪表工程施工及质量验收规范GB50093-2021 Chinese instrument cons
6、truction work code.石油化工仪表工程施工技术规程SH3521-2007 Petrochemical instrument construction work code. 电气和仪表回路检验规范GB/T25921-2021 自控安装图册HG/T21581-2021 电气装置安装工程爆炸和火灾危险环境施工及验收规范GB50257-96 建筑工程施工现场供用电安全规范(GB50194-93);Power Supply and Utility Safety Regulations on Construction Engineering Site GB50194-93建设工程安全管理条
7、例第三章:仪表实物工作量 Chapter 3- Instrument quantity of work名称单位数量名称单位数量温度仪表台36调节阀台18压力变送器台24过程开关台86差压变送器台2分析仪表台5差压液位变送器台15有毒气体检测仪台2液位仪表台16仪表电缆米39666流量仪表台29桥架米2122开关阀台51仪表管路米1147第四章:施工的主要程序 Chapter 4-Main construction procedure1.主要施工程序流程图施工前准备preparation before construction设计交底design disclosure图纸会审joint revi
8、ew of drawings领、检设备材料receive, check equipment and materials预埋管、件安装embedded pipe, fittings installation支托架立柱预制安装Support bracket column installation of prefabricated 仪表单校Instrumentsingle calibration盘柜及底座制作安装cabinet fabricationandinstallation电缆保护管安装Cable protection pipe installation桥架、就地盘柜接线箱安装tray, ca
9、binet wiring box on site installation 配合工艺一次部件安装With the installation process once part现场仪表安装site instrument installation电缆敷设cable laying导压管、气源管、伴热管安装Impulse control, air supply pipe, heating pipe installation仪表导压管试压 Instrument guide pressure pipe pressure test管线上仪表拆除、隔离阀关闭Dismantle the pipeline Ins
10、trument, isolation valve closed试压、试漏Pressure testing, leak testing校、接线calibration, wiring现场仪表二次安装Secondary field instrumentation installation系统联校system joint calibration配合单体试车single commissioning交工 验 收acceptance2.准备工作 Preparation1)组织施工有关人员进行交底,充分做好施工图会审工作,及时解决图纸中发现的问题,从而为施工阶段争取时间。Organize technical
11、clarification and DWG review, problems existing in DWGs shall be quickly solved to gain more time for TAR.2)根据设计图和有关资料编制好设备材料表和有关施工资料,熟悉设计的规范、标准、设计图纸以及有关的操作说明等资料。Prepare material list and related construction documents as per designed DWG and relative documents. Be familiar with codes, standards, DW
12、Gs and guidelines. 3)熟悉施工有关的资料及图纸,了解现有仪表的原理及接线柜位置。Be acknowledgeable with construction related documents and DWGs , be clear with existing instrument philosophy and junction box location.4)对施工班、组进行全面系统的技术交底,上岗人员能熟悉图纸,明确施工任务和施工要点,规范及特殊要求。Technical clarification to construction team shall be complete
13、and systematic, make sure construction personnel are familiar wit DWGs, work content and requirements. 5)及时了解设备、材料到货情况,设备到货时,一定要根据厂家提供的装箱单、技术资料,会同业主、监理单位开箱检验,核实仪表设备材料的规格,型号及数量是否符合设计要求,并做好记录,并在干燥清洁的条件下妥善保管。Be clear with material and equipment status, open-box inspection jointly with IET and BYC as pe
14、r packing list and technical documents provided by manufacturer, check if equipment and material specification, type and quantity are satisfied, and record made, all equipments and materials received shall be well kept. 6)准备好干燥清洁的房间,作为调校室,环境应符合要求。班组要检查机具是否完好,检验期是否有效,校验仪表的等级是否符合要求。A clean room will b
15、e prepared to be as calibration room which shall comply with environmental requirements. Machines and tools shall be checked with completeness and expires by the group and instrument shall be checked with its grades.7)施工机具的准备。Preparation on construction machines and tools (1)根据图纸及工作量准备各种施工工具;Prepare
16、 various construction machines and tools as per DWG and work quantity. (2)现场严禁使用活动扳手,需要按照仪表规格书、安装图、管道ISOMETRICS图准备同规格的套筒、梅花、开口扳手等。Movable wrench is not allowed to be used on site, sleeves and open-end wrench shall be prepared as per the specification provided in specification, hook-ups, and pipe iso
17、metrics.2施工前期1)仪表安装受装置作业、工艺设备、工艺管道、土建等专业的现场条件限制,不宜提前进行,但一些安装可在前期完成或部分完成。如:Site conditions limit advance construction of TAR instrument erection considering plant operation, process equipment & piping , civil, however, some installation can be finished at pre-TAR or partially finished. (1)仪表单体调校,阀门强度
18、试验。Instrument unit calibration, valve strength test.(2)桥架支架预制。Cable tray support fabrication(3)部分主桥架安装。Partial main cable tray erection(D477i piperack replacement, D472i piperack partial cable tray erection, D473i piperack cable tray)(4)变送器支架预制。Transmitter support fabrication(5)盘柜基础预制Cabinet foundat
19、ion fabrication(6)接线箱支架预制。Junction box support fabrication(7)接线箱、气源分配器安装。Erection of junction box and air distributor. 3. 施工中期 Middle stage of TAR 在工艺设备、管道安装陆续完成,整个工作已初步明朗,仪表安装进入施工高潮,这段时间工期紧, 任务重,且多种工种交叉作业,应妥善安排施工计划。At this time, most process equipment and piping erection has been finished, instrume
20、nt erection enters into climax; tight time, heavy task and multi-trades crossing requires a detailed and strict schedule.施工高潮主要工作如下:Main works for this time1)分支桥架(接线箱至仪表)、气源管线敷设(气源分配器至气动阀门)。Branch cable tray laying (from junction box to instrument), air distributor wire pulling(from air distributor
21、to pneumatic valve )2)电缆敷设。Branch cable pulling(from junction box to instrument)3)导压管安装。Pressure pipe installation4)安装仪表、校接线。New and dismantled instrument installation, pressure test, leakage test, wiring calibration. 5)回路测试。Loop test4施工后期 Late stage of TAR在所有安装工作结束后,要对整个安装工程进行“三查四定”和系统联校、仪表投运工作,此项工
22、作必须会同业主和监理等有关人员,根据施工验收规范要求,对整个仪表施工全面检查,记下不合格点,并逐个给予解决,最终办理交付验收工作。When all installation work finished, work out punch list and clean all items remained, then conduct system calibration and instrument commissioning jointly with IET and BYC related personnel. A full inspection is required to find out n
23、on-conformances and solve one by one. IET, BYC, MAV1 and supervision unit shall be involved in system loop calibration and make decisions, finally, acceptance work will be performed. 第五章:主要施工方法和技术要求 Chapter 5-Construction technical requires and quality standard.1. 仪表盘柜的安装Dashboard cabinet installati