国家电网职称英语考试复习题-补全短文.docx
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《国家电网职称英语考试复习题-补全短文.docx》由会员分享,可在线阅读,更多相关《国家电网职称英语考试复习题-补全短文.docx(7页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、WORD格式补全短文Passage 1Functions of power transmission CEADB The function of (1) is to send power fromA. step-down substations and connected transmission equipmentB. power network operationC. power transmissionD. transmission at high voltageE. power networksPassage 2 Substationmisoperationand itsprevent
2、ingCEABDThe misopemtion that can lead to (1)A. preventing the misoperation in substationB. the closing of grounding switch with power onC. accidents in the electrical operation of the substation D. the persons from illegal entering the lived bayE. the grounding wire (closing the grounding switch) wi
3、th power onPassage 3 A brief introduction on the development of supercritical boilers and their main advantages BDEACIn (1) such as U.S.A , Japan and EuropeanA. good homogenization of distribution B. some advanced countriesC. whole process management is strengthenedD. great advantages oil economy an
4、d environmental protectionE. subcritical once-through boilerPassage 4 Steam generation and useBEADCSteam is one of mans dependable servants More and more in the background , steam is doing more and more work for man. In (1)A. first generating steamB. an electrically heated homeC. use of steam for el
5、ectric power generationD. the new generating capacity being installedE. the fuel is uranium and the heat is suppliedPassage 5 Circuit breakerBDAECCircuit breakers are automatically operated high voltage (or high current) switches. Circuit breakers are required (1)B. to control electrical power netwo
6、rks C. of the circuit breakerD. to switch the current which can be from a few amperesE. of the highest importance for high reliabilityPassage 6 The ratio of distance to height of pumped-storage power plant BDACEFor pumped-storage power plant, generally the ratio of distance to height (l),A. is most
7、economicB. is used to evaluate topographic condition of power plantC. is not desirableD. is the ratio of horizontal distance between upper and low reservoirE. is the bestPassage 7 Fuel cellsBAECDFuel cells are devices that when a fuel such as hydrogen or hydrogen-rich compounds and oxygen are suppli
8、ed to materials arranged like the anode and cathode of a conventional batteryA . further development is under wayB. there is no storage capacity in a fuel cellC. many cells are operated in series to obtain voltages D. supply alternating current from fuel cellsE. as they are being developed there hav
9、e been some applicationsPassage 8 Substations pace into the Digital Age CAEBDSubstations constitute the main part of power transmission and distribution in a power grid. The substations (1)A. substation automation technology has reached a certain levelB. simulation training technology for substation
10、 operationC. composed of a large number of primary and secondary equipmentsD. a full-digital automation systemE. all of which has become an indisputable fact专业资料整理Ato perform any switching operation after long periodsPassage 9 Overcoming the Problem of WasteCADEBMany large cities are anything but be
11、autiful Streets arelittered with trash. In this trash, however, (1)A. there is no time to be lostB. building beautiful cities out of garbage is only a dreamC. there is still something that can be useful D. it can be put to use againE. more and more machines are designed for this purposePassage 10 Hi
12、bernationEBDACThe weather in winter. Call be very cold. Some animals sleep during the winter, for its difficult for them to find food then. (1)Passage 13 Switching overvoltageEABCDA sudden change in the configuration of transmission network caused (1)A. determine the insulation requirements of trans
13、mission linesB. the cost of transmission and 1ine failure rate C. at both opening and closing of circuit breakersD. by means of circuit breaker closing resistor in 500kV systemE. by the operation of a circuit breakerPassage 14Transmission lineand distributionlineADBCEThe high voltage power line thro
14、ugh which power is (1)A. So they don needt to worry about bad weather andA. transmitted from power plants step-up substation toother dangerous animalsstep-down substationB. We call this kind of sleep in wintertime“ hibernationB. the overhead transmission lineC. As it gets warmer and warmer in spring
15、 , the sleepingC. lightning frequently happening and heavy raininganimals begin to wake up and look around for foodD.the powerlinethattransmitsthepowerfromD. Hibernating animals don t need to eat much becausestep-down substationthey don t moveE. 1arge spanning line sectionE. They can sleep for a lon
16、g timePassage 15 Transformer insulationCEABDPassage 11 SatellitesBDACEThe body that is neatest to the Earth is the moon. (1).A. The bigger and heavier a body is, the greater is its force of gravityB. It circles the Earth and is therefore know as a satellite of the EarthC. To get out into space we ha
17、ve to overcome the Earth s gravitational pullD. A satellite stays in orbit because the planet gravitational force keeps pulling it into a circleE. Artificial satellite can be used for various purposesPassage 12Secondary equipmentinpowersystemBDEACThe secondary equipments in power system are (1)A. 5A
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国家电网 职称 英语考试 复习题 短文
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内