1、热控盘柜安装Thermal control panel installation施工作业指导书Construction Work Instruction施工作业指导书审批表Construction work instruction approval form作业项目名Job name热控盘柜安装Thermal control panel installation编号No.编制Prepared by签名 signature:日期 date:专业审核Departmentreview签名 signature:日期 date:项目审 批工程engineering签名 signature:日 期 dat
2、e:质量 quality签名 signature:日期 date:1 .施工准备 Construct ion preparatio n1 ,技术准备:开始制作、安装前,查阅集控室、电 子间布置图,了解施工过程中热控中盘(箱、柜)的 数量,核算工作量,提出材料计划;并与土建、机 务专业图纸核对,检查盘(箱、柜)的位置、尺寸是 否与其他专业设备、管道等布置有冲突,如有矛盾, 汇总后提交专业工程师,由专业联系设计院出设计 变更;检查与盘联系的电缆主通道设计是否畅通, 保证与电气专业的接口正确。Technical preparation: Before starting the production,
3、 consult the CCR and electronic equipment room, understand the number of I&C devices (boxes and cabinets) during the construction process, statistics volune of the project and submit the material plan; then check the drawings of civil and mechanical and check whether the position and size of the pla
4、te (box and cabinet) collision with other professional equipments and pipe layout. If there is any contradiction submit it to the professional engineer after the summary, change the design by the collision engineer design institute and check the cable Main channel design is smooth to ensure that the
5、 electrical interface is correct.2 .开箱查验:会同厂家,物资,项目部专业人员共 同开箱检查,盘面应平整,内外表面漆层应完好; 盘柜的外形尺寸、仪表安装孔尺寸、盘装仪表和电 气设备的型号及规格等应符合设计,配件齐全。Arrived Inspection :To together with the vendor, procurement , project staff to unpacking acceptance, the cabinets surface should be smooth, interior and exterior surface shou
6、ld be intact. cabinets enclosuredimensions, instrument mounting hole size, cabinet instrument and electrical equipment model and specifications Should be consistent with the design ,should be completed.3 .现场复核:随着土建、机务安装进度,适时去现 场核实,提请土建专业预留孔洞、预埋铁件,配合 土建、机务预埋进盘电缆保护管。Site recheck: With the civil constr
7、uction of mechanical department and civil department installation progress, timely to the scene to verify, civil department to reserve holes, embedded iron pieces, with civil engineering, mechanical process to install into the conduits and cable trays.4 .人员配备详见作业条件,对所有施工人员进行技 术和安全交底,并做好签字记录。Personne
8、l equipped with the operating condition ,to take safety and technology explanation for worker and to make signature record before working.5 .机具配备(详见作业条件)。equipment (see operating conditions).2 .设备材 料领取运 输 Equipmen t material to receive transporta tion1 .从钢材库领取槽钢、角钢等材料。From the steel house to receive
9、 the Channel steel , Angle steel and others.2 .从焊材库领取焊条、油漆等材料。From the welding library to receive electrodes, paints and other materials.3 .从设备库领取需安装的热控盘、台、柜。From the equipment library to receive the installation of I&C panel, desk and cabinets.注:Note所有设备、材料的质量、型号规格要符合图纸设计 要求及国家质量标准和规范,且经过报审及业主验 收。A
10、ll the equipment quality of materials model specifications to meet the Drawings design National quality standards and norms, and after the trial and the owners acceptance.5.3 盘柜底座制作工序卡:Manufacturing process card for Panel base production操作方法:Method of operation序号及步 骤名称Serial number and stepname主要作业方
11、法和操作要求Main working methods and operational requirements工艺质量要求Process quality requirementsL底座制作所使用的槽钢要求平整,无重皮、残缺 现象,且有出厂合格证,材料的型号、规格应符合 图纸设计要求。The channel should be smooth and no glitch , no deforming with the certification, material type andsize design requirements of the drawings.L盘柜底 座制作 Panelbase
12、 productio n2 .制作前材料应进行调平、调直。The material before making should be leveling and straightening.3 .下料:底座尺寸根据图纸设计用无齿锯下料,严 禁采用气割下料。下料要留出余量,以免制作后总 长度小于计算长度,一般每面盘多预留。Material cutting: Base size according to the design of the drawings with no-teeth saw cutting , prohibit the use of gas cutting material. The
13、 material should be set aside to avoid the total length of the production is less than the length of the calculation, generally reserved for per panel.焊接符合DL/T5210.7规 定。Welding complies with DL/T5210.7 regulations.4.底座应在施工平台上进行制作,组装时应横平竖 直。用水平尺、直角尺找平、找正后用电焊点焊, 再反复进行检查、调整,整体整洁美观便可焊牢。 The base should
14、be made on the construction platform, and the assembly should be horizontal and vertical. Use horizontal ruler, right angle ruler to find flat, correct after using welding spot welding, and then repeated inspection, adjustment, the whole neat and beautiful can be welded firmly 5.盘底座外表面焊口应打磨平整。The ou
15、ter surface of the plate base should be polished and flat.2 .防腐处 理Antiseptic treatment1 .底座制作完成后,将附着在焊缝上的药皮清理干 净。After the base is made , the medicine skin attached to the weld should be cleaned.2 .用铁刷子将底座内外表面的铁锈清理干净。Using an iron brush to clean up the rust on the inside and outside of the base.3 .将
16、器皿中的防锈漆用油漆刷调匀,然后在底座的 焊口处均匀、完整地涂刷防锈漆,待防锈漆晾干之 后再均匀地涂刷银粉漆。油漆涂刷形状为方块, 要防止油漆流淌污染 材料地面、涂刷油漆须 均匀、完整、美观Paint brush shape for the box, to prevent the paintflow contaminated material floor, brushing paint must be uniform, complete, beautifulThe paint used in the vessel is thoroughly mixed with the painting br
17、ush, then in the base of the welded joints evenly, complete brushing antirust paint, to paint dry and then evenly brushing silver paint.5.4 热控盘柜底座安装工序卡:Cabinet base installation process card操作方法:Method of operation序号及步 骤名称 Serial number and step name主要作业方法和操作要求 Main operating methods and operational
18、 requirements工艺质量要求Process quality requirements盘底座安 装 Cabinet base installatio n1 .将盘底座搬运到现场安装位置,搬运存放时轻抬 轻放,防止强烈碰撞、振动而产生变形。Move the cabinet bases to the installation location, Handle light and weight when carrying, to avoid strong collision, vibration and deformation.2 .底座安装应在地面或平台二次抹面前进行。The floor
19、or platform should be second floated before base installation3 .根据图纸找出盘的安装中心线,确定底座的安装 位置。According to the drawing to find out the installation center line of the panel and to determine the base of installation position.4 .底座安装前,要清理基础地面或基础沟,将预埋 的铁件找出,在没有预埋铁的地方,则将固定铁件 用膨胀螺栓固定在地面上。Before the installati
20、on of the base to clean the ground or foundation ditch and found out the embedded iron pieces and then to fix the iron with expansion bolts on the ground, Where is no pre-embedded iron.1.焊缝饱满,水平焊缝打 磨后与盘底座高度一 致。The weld is full, the horizontal weld is polished and the plate base is highly consistent.
21、5 .在适当位置放置水准仪,以土建专业二次抹面的 标高为基准找平,以检查有无过高之处。Take the water level on appropriate location, with civil engineering secondary wiping the elevation of the surface as a benchmark to check for excessive.6 .盘底座上表面一般应高出最终地面。The upper surface of the disk base is generally higher than the final ground7 .将底座就位,
22、据盘中心线找正,再用水平仪找平, 同时以预先准备好的不同厚度的垫铁在底座下进 行调整。Taking the base is in place, according to the center line of the cabinet to find alignment and then using the water level to find standard, at the same time to the different thickness of the horn prepared in advance under the base to be adjusted.8 .找平后,再校对其
23、中心线,合适后用电焊将底座与 预埋件点焊,复查正确无误后将底座与垫铁、预埋 铁件焊牢。Before welding the base with the embedded parts we need to find out the level and then to check the center line, Then to recheck the correction after the base and the horn embedded iron welding.2.盘底座接地必须良好, 盘底座接地必须至少为 两点接地。Ground the chassis base must be go
24、od, grounding the base of the chassis must be at least two points.5.5 热控盘柜的运输工序卡:Container transport process card序号及步 骤名称 Serial number and step name主要作业方法和操作要求Main operating methods and operational requirements工艺质量要求 Process quality requirements1.盘柜的 运输 Container transport1 .盘柜吊装前必须进行上报专业申请吊装许可,并 对