PFMEA潜在失效模式及后果分析.xls
《PFMEA潜在失效模式及后果分析.xls》由会员分享,可在线阅读,更多相关《PFMEA潜在失效模式及后果分析.xls(6页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、 Page 1 of 6POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS(PROCESS FMEA)FMEA Number:潜潜在在失失效效模模式式及及后后果果分分析析(过过程程FMEA)FMEA 编 号:Part name:Process Responsibility:Prepared By:Approval By:零件名称:过程责任部门:编 制:批 准:Part number:Key Date:FMEA Date(Orig):FMEA Date(Rev.):Rev.零件号:关键日期:FMEA 日期(编制):FMEA 日期(修订):版本:Core Tea
2、m:主要参加人:Process Process Potential Cause(s)/Current Process Controls现行工艺控制person in charge负责人Action ResultsstepFunctionPotential FailurePotential Effect(s)SEVspecialMechanism(s)OCCDetec R.P.N.Recommended措施结果工序号 过 程Mode of Failure严重特of FailureUR不易探 风 险Action(s)Action Taken采取的措施SEV OCC DETR.P.N.Require
3、ments潜在失效模式潜在的失效后果度数性潜在的失效起因/机理频度数PreventSurvey测度数 序 数建议的措施严重级不易探 风 险 要 求预防探测度数数测度数 序 数AMaterial incominginspection原材料入库检验ADC12 Chemicalcompositionbeing out of standard.ADC12化学成分不符合标准。Material strength isnot qualified材料强度不合格Product performance,customer complaints产品性能降低,客户抱怨6The supplier didnot test供
4、方未做出厂检验3Supplier quality guarantee andmaterial analysis report供方提供质量保证书和材质分析报告Check each lot with aspectrometer.对每一批抽取1PCS材料做光谱分析236NONEBStorage material材料入库package in damagedcondition包装破损Scattered material,easy mixing材料散落,易混料5Porter did not onthe materialhandlingsafety/protectivenot in place搬运工未对材料
5、搬运安全防护/防护不到位3Material handling using aspecial revolving cars/box/tray材料搬运使用专用周转车/箱/托盘Visual 目视230NONE,material got damp材料受潮Mold material,ledto the decrease ofthe materialperformance材料发霉,导致材料性能下降5Didnt domoistureproofprocessingmaterials piled up材料堆放没有做防潮处理3Material warehouse laying padstorehouse boar
6、d(120 mm)材料仓库铺放垫仓板(高度120mm)Visual 目视230NONEMaterial put wrongidentification材料标识错误shopwork took thewrong materials车间领错材料6Warehouseadministratorwriting labelmistake仓库管理员书写标签错误3Materials piled up housekeepingmanagement.材料堆放施行定置管理。Library records(account/card/)查库记录(帐/卡/物一致)236NONECGet the material领料pack
7、age in damagedcondition包装破损Dirty material offthe ground材料掉地上弄脏4Handling rawmaterials there isnosafety/protectivedoes not reach thedesignated position搬运原材料没有安全防护/防护不到位2Material handling using aspecial revolving cars/box/tray材料搬运使用专用周转车/箱/托盘Visual 目视216NONEDMeltDown,heatpreservation溶解,保温After melting
8、theunqualified material熔炼后的材料成分不合格the part performanceis bad.产品性能不良6Furnace residue ofother materials换料时以前的材料未处理干净3staff training,designatesomeone to do培训并指定专人换料Each furnace by inspector 1PCS material spectralanalysis每炉由检验员抽取1PCS材料做光谱分析236NONETemperature isbeyond thetechnologicalrequirement炉温超出工艺要求c
9、old shut,stickymold产品压铸时出现冷隔,粘模等现象6the material addtoo much熔炉加的料太多3Make the instruction编制作业指导书,Set up automatic alarm设定炉温超差自动报警Visual temperature controlbox随时目视温控箱236NONE表单编号:表单版本:A/0 Page 2 of 6Materials withdirt,Slag,degassingis not clean材料上有污物,杂质,气,未除干净Products areporosity,coldshut,die.产品出现气孔,冷隔,
10、粘模等缺陷,Knifeproducts have hardpoints,resultingin crack产品上有硬点,导致崩刀。6Back to thematerial on thedirt,slag,degassing frequencyis too low回料上有脏污,除渣,除气频率太低,Agent istoo little,back tothe materialproportion is toohigh药剂太少,回料比例太高,3Die casting wi,back to the materialproportion,slag,degassing frequency,reagent r
11、atio,temperature of furnacetemperature setting.Each class everyfurnace sampling analysis of thespectrum,try processing products编制压铸作业指导书,规定回料比例,除渣,除气频率,药剂比例,炉温设置温度。每班每炉都抽样做光谱分析,试加工产品Every time slag,degassingmust be recorded,foreman,according to the process cardcontrol each parameter,eachclass every
12、furnace samplinganalysis of the spectrum,eachtest time,every time twoproducts每次除渣,除气都必须记录,领班按工艺卡对照各个参数,每班每炉都抽样做光谱分析,每班试车一次,每次2个产品472NONEProduct warping产品变形,dehiscence裂开Product deformationcause assemblyperformance isbad,CNC machiningpositioning产品变形导致装配性能不好,影响CNC加工定位Productobsolescence,产品报废6 1.Close m
13、old timeshort,1.合模时间短,2.Moldtemperature is toohigh模温或铝液温度太高3.Thimble,abnormal3.顶针异常4.First hand tappingslag bags andmaterial4.手工敲渣包和料头41.Boot set parameters according tothe process card1.开机按工艺卡设定参数.2.Check the cooling waterpipe connection is correct,leaking正确的连接冷却水管,打开冷却水,检查水管是否有漏水现象,3.To smooth oil
14、thimble and guide pin3.每班定期给顶杆和导柱上嫩滑油。4.Provisionsof slag package and material canonly be removed by trimming4.规定渣包和料头只能靠切边去除Inspectors periodicallychecking productappearance.size检验员定期巡检产品外观。尺寸372NONEProducts in everyskin,flash产品出现隔皮,飞边Products to rework,Get rid of burrs产品要返工,修边5Injection pressureis
15、 too great,theclamping force isnot enough,positioning andwear压射压力太大,锁模力不够,定位机构磨损6Boot according to the processcard set parameters,positioningsurface down开机按工艺卡设定参数,定位机构表面淡化处理Visual 目视390Reduce thepressure ofinjection,moldonce every 50000die casting mouldand replacement减小压射压力,模具每压铸5万模修配一次Die castingd
16、irector压铸主管:su yong.ToolingManager:chenaifu模具部经理:陈爱福Die castingtechnologyparametersmonitored,mouldreplacement压铸工艺参数监控,模具修配54360Gas-hole 气孔coldshut冷隔The part has poorburst strength.产品受力易断,加工面出现气孔导致产品报废61.Processparameters accordingto the process cardset工艺参数未按工艺卡设定2.Mold temperatureis toolow模温太低3.bisc
17、uitis thin.zinc escapes,料柄薄,飞铝,3.Noslag,degassing铝液未按时除渣,除气4.Mould exhaust模具排气不畅31.Process parameters set strictlyaccording to the process card工艺参数严格按照工艺卡设定.2.每次加过料后,都进行一次除渣,除气3.Devicestarts a thermometer is used tomeasure the mold temperature,after passing at the start ofproduction设备启动后使用测温仪测量模具温度,
18、合格后,在开始生产.4.Inopening mould cold-lap exhaust slot模具冷隔处开通排气槽1.Check process parametersconform to the requirements ofthe process card1.检查工艺参数是否符合工艺卡要求2Operator self-inspectionproduct appearance.作业员自检产品外观3Inspectors to tryprocessing check porosity.检验员试加工检查气孔590Improving thestructure of themould改善模具Tool
19、ing Manager:chen aifu模具部经理:陈爱福Increase theporosity and havea cold orincreasing slagpackage,increase exhaustslot有气孔和有冷隔的地方增加或加大渣包,增加排气槽72570DMeltDown,heatpreservation溶解,保温POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS(PROCESS FMEA)FMEA Number:潜潜在在失失效效模模式式及及后后果果分分析析(过过程程FMEA)FMEA 编 号:Part name:Process Re
20、sponsibility:Prepared By:Approval By:零件名称:过程责任部门:编 制:批 准:Part number:Key Date:FMEA Date(Orig):FMEA Date(Rev.):Rev.零件号:关键日期:FMEA 日期(编制):FMEA 日期(修订):版本:Core Team:主要参加人:Process Process Potential Cause(s)/Current Process Controls现行工艺控制person in charge负责人Action ResultsstepFunctionPotential FailurePotenti
21、al Effect(s)SEVspecialMechanism(s)OCCDetec R.P.N.Recommended措施结果工序号 过 程Mode of Failure严重特of FailureUR不易探 风 险Action(s)Action Taken采取的措施SEV OCC DETR.P.N.Requirements潜在失效模式潜在的失效后果度数性潜在的失效起因/机理频度数PreventSurvey测度数 序 数建议的措施严重级不易探 风 险 要 求预防探测度数数测度数 序 数表单编号:表单版本:A/0 Page 3 of 6corebending型芯弯曲,拉模Product proc
22、essingnot,affect theassembly,leading toproduct scrap产品加工不出,影响装配,导致产品报废。6Core materialhardness is notenough,not usemold release型芯材质不够硬,未喷到脱模剂。6Each product fixed spray head,can automatic sprayingproduction每个产品固定喷雾头,5000 per die casting mold andcore titanium plating生产时只能自动喷涂,每压铸5000模,型芯镀钛一次。the QC ins
23、pector checks thepart appearance according tothe inspection card。检验员应按照产品检验单对产品外观进行检验进行检验3108Fixed spray head,titanium coating onthe surface of thecore固定专用喷雾头,型芯表面镀钛Die castingdirector压铸主管:su yongFixed sprayhead,re,Forevery 5000model core diecasting titaniumcoating again固定专用喷雾头,每压铸5000模型芯重新镀钛73363Pl
24、unger surface istoo high or too low顶杆凹凸Lead to productrework,or evenscrapped导致产品报废,返工5Push rod bent orbroken顶杆弯曲,顶杆断4定期给顶针上嫩滑油On a regularbasis to the thimble oil oftender the QC inspector shouldstrengthen not regularinspection检验员应定期进行巡检240NONETrimming切边Product surfaceblunt injury,bruised产品表面冲伤,压伤Le
25、ad to productrework,or evenscrapped导致产品报废,返工。装配时出现干涉6Aluminum cutting dienot clean切边模上铝屑未吹干净,Blanking die bladewear切边模刀口磨损,Product is not inplace or product notcooling trimming产品未放到位或未冷却就切边6training on the workers for thework instruction 对员工进行培训,指导操作规范.Conveyor beltwith fan cooling time传送带上加装风扇,使产品冷
- 配套讲稿: