菲律宾基建项目概览-53页-WN7.pdf
《菲律宾基建项目概览-53页-WN7.pdf》由会员分享,可在线阅读,更多相关《菲律宾基建项目概览-53页-WN7.pdf(53页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Build Better More:A Glimpse into the Philippines Infrastructure ProgramJune 2023Disclaimer:If you are not the intended recipient,any unauthorized disclosure,copying,dissemination or use of any of the information is strictly prohibited.This presentation contains data sourced from variousPhilippine go
2、vernment agencies,unless otherwise indicated in the relevant slides.Agency Contact DetailsNational Economic and Development Authorityhttps:/neda.gov.ph(632)8631-0945foineda.gov.phDepartment of Energyhttps:/www.doe.gov.ph(632)8479-2900ipodoe.gov.phdoe_Department of Public Works and Highwayshttps:/www
3、.dpwh.gov.ph(632)165-02+639616847084Department of Transportationhttps:/dotr.gov.ph/(632)726-4925(632)790-8300Public-Private Partnership Centerhttps:/ppp.gov.ph(632)8709-4146Infoppp.gov.phFor more reference materials please use the link below:Investor Relations Group Bangko Sentral ng Pilipinashttps:
4、/www.bsp.gov.ph/Pages/IRO.aspx(632)8708-7487iro-semubsp.gov.phNOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)Table of ContentsI.Overview of the Philippines Infrastructure Flagship Projects 4II.Department of Energy.23III.Department of Public Works and Highways.29IV.Department of Transportation.
5、40V.Public-Private Partnership Center.46VI.Agency Contact Details.53NOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)Infrastructure Flagship Projects4NOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)The Philippines Infrastructure Flagship Projects:Infrastructure Drive Supporting Economic Tra
6、nsformation The IFPs are game-changing,transformative,and urgently needed infrastructure projects of national significance that aim to showcase the overall Build-Better-More Program.Of the 3,770 infrastructure Priority Programs and Projects(PAPs),with an indicative total investment requirement of PH
7、P17.3tn(US$314.5bn*)over the medium term,194 projects are listed under the high-impact IFPs approved by the National Economic and Development Authority(NEDA)Board,chaired by President Ferdinand R.Marcos,Jr.,on 9 March 2023.Infrastructure Flagship Projects(IFPs)123 Spatial/Geographical Context Priori
8、ty Areas for Increased Spending Premium for PPP projects not requiring budget allocation Second-Level Prioritization Implementation readinessThird-Level Categorization Consistent with and contributes to national development objectives and priorities Costing at least PHP2.5bn(USD$45.5mn*)First-Level
9、Screening/“Must”CriteriaCriteria for Inclusion in the List of IFPsSource:NEDA.For more information on the IFPs please refer to https:/neda.gov.ph/infrastructure-flagship-projects/*-PHP-USD Exchange Rate:PHP55.00=US$1.005NOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)ODAPPPGAAHybrid PPPTBDUS$15
10、0.9bn*IFPs Total Estimated Cost“Through our Build Better More flagship program,we have placed infrastructure development as the pinnacle of our vision foran equitable,prosperous,and resilient Philippines by 2040.“President Ferdinand Marcos,Jr.(High-Level Dialogue on Investing inInfrastructure For Re
11、silience,January 2023)The Philippine Infrastructure Flagship Projects(IFPs):An Overview194 high-impact IFPs to spur and accelerate economic growth across the archipelagoNumber of IFPs per region(as of 31 March 2023)Massive investment in infrastructure IFPs by mode of financingEnhancing competitivene
12、ss through infrastructure buildupIFPs by type119 Physical connectivity44 Waterresources14 Agricultureprojects6 Healthinfrastructure5Digitalconnectivity1Power and energy5Other infrastructureSource:NEDA*-PHP-USD Exchange Rate:PHP55.00=US$1.006NOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)IFPs c
13、onnect loci of economic activities and provide the commuter belt a seamless travel experience(Select projects as of 31 March 2023)Source:NEDA,DPWHAn 8-km all elevated 4-lane toll expressway extending the NLEX southward from the end ofSegment 10 in C3 Road,Caloocan City,to PUP Sta.Mesa,Manila and con
14、necting to theSkyway Stage 3,and mostly traversing along the PNR rail track.The project includes two(2)interchanges located at C3 Road/5th Avenue,Caloocan and Espaa Avenue,Manila.Project Impact:The project will serve as another north-south backbone highway providing a seamless traffic,which will red
15、uce the travel time from Naga City to Danao City from 3 hrs to 1 hr and 10 min.Project Details:Implementing Agency:Department of Public Works and Highways(DPWH)Funding Source:Public Private Partnership(PPP)(Unsolicited)Project Status:OngoingNLEX-SLEX Connector RoadConstruction of an 8.3-km,4-lane ex
16、pressway from Segment 8.1 at Mindanao Avenue,traversing westward to Republic Avenue and turning right to Luzon Avenue up toCommonwealth Avenue in Quezon City.Project Impact:Reduce travel time from Mindanao Avenue going to Commonwealth Avenue from 45minutes to 10 minutes.Will benefit 45,000 motorists
17、 per dayProject Details:Implementing Agency:Department of Public Works and Highways(DPWH)/TollRegulatory Board(TRB)Funding Source:Public Private Partnership(PPP)/Supplemental Toll Operation Agreement(STOA)Project Status:OngoingNorth Luzon Expressway(NLEX)Segment 8.27NOT FOR CITATION.SUBJECT TO CHANG
18、E(AS OF 8 JUNE 2023)IFPs connect loci of economic activities and provide the commuter belt a seamless travel experience(Select projects as of 31 March 2023)Construction of 44.58 km expressway connecting CAVITEX in Kawit,Cavite,and SLEX Mamplasaninterchange in Binan,Laguna.Project Impact:Aims to redu
19、ce travel time from 1.5hours hours to 45 minutes.This will connect fastest growing provinces hosting major industrial projects and ecozones.The area is home to massive bedroom communities and the most densely populated provinces per square kilometerProject Details:Implementing Agency:DPWHFunding Sou
20、rce:PPPProject Status:OngoingCavite-Laguna Expressway(CALAX)18.9-km(exclusive of aprons andramps),4-lane,bi-directional greencorridor extending fromCommonwealth Avenue to the south at Quezon City through the La Mesa reservation to San Jose DelMonte to Norzagaray,Bulacan.ProjectImpact:Aims to ease th
21、e traffic congestion of Northeast Metro Manila while providing a new scenic corridor toNortheast Luzon destination;develop a balanced constructed ecosystem to sustain a positiveenvironmental impact;serve as a water management system,in-pipe turbines will be installed toproduce renewable electricity;
22、with the assurance to:provide authorized access,monitoring and routinemaintenance to aqueduct fittings along the toll roads and right-of-way as well as ensure structuralintegrityand strategicsecurityof the MWSS undergroundaqueducts,facilities and accessories.ProjectDetails:ImplementingAgency:Departm
23、entof Public Works and Highways(DPWH)Funding Source:PPPProjectStatus:For GovernmentApprovalNLEX(La Mesa ParkwaysProject)Source:NEDA,DPWH8NOT FOR CITATION.SUBJECT TO CHANGE(AS OF 8 JUNE 2023)Construction of a 417-km,4-lane divided toll road starting from the terminal point of SLEXTR4 Project at Brgy.
24、Mayao,Lucena City,Quezon,and ends in Matnog,Sorsogon,near theMatnog Ferry Terminal.Project Impact:This project aims to connect Quezon and Bicol provinces.Provide better and safer access totourism destinations,roro ports,fish ports and to address traffic congestion in Bicol region.Project Details:Imp
25、lementing Agency:DPWH/Toll Regulatory BoardFunding Source:PPP/STOAProject Status:OngoingSLEX Toll Road 5(TR5)Segment 166.7-km expressway from Sto.Tomas,Batangas to Tayabas/Lucena City,Quezon ProvinceProject Impact:Improve the transport of goods and services from Southern Provinces to Manila and vice
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 菲律宾 基建 项目 概览 53 WN7
限制150内