[精选]PhasedPPAPprocessVCC.pptx
《[精选]PhasedPPAPprocessVCC.pptx》由会员分享,可在线阅读,更多相关《[精选]PhasedPPAPprocessVCC.pptx(39页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、VCC Phased PPAP process沃尔沃汽车Phased PPAP流程VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 2Issue date:12/Jul/2023,Security Class:PublicThis course describes the purpose and applicability of VCC Phased PPAP Production Part Approval ProcessSection1:General introduction to PPAP/PPPAP简介Section2
2、:VCC Phased PPAP Introduction VCC阶段PPAP介绍VCC phased PPAP 沃尔沃阶段PPAP Supplier Roles&Responsibilities 供给商角色和职责Submission to Customer+Exception management 递交客户和让步管理流程Section3:Phased PPAP Benefits 阶段PPAP的优势Difference between PPAP&VCC Phased PPAP PPAP和阶段PPAP的差异Phased PPAP handbook 阶段PPAP手册COURSE OVERVIEW
3、课程概述课程概述 RR Ph0+Ph1/2 Ph3PPAPorderVCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 3Issue date:12/Jul/2023,Security Class:PublicSection 1:General introduction to PPAPPPAP简介Purpose for this Section:PPAP Introduction PPAP简介VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 4Issue date:
4、12/Jul/2023,Security Class:PublicWhat is PPAP?什么是什么是PPAP PPAP stands for Production Part Approval Process PPAP是生产件批准程序PPAP defines Generic requirements for production part approval.PPAP定义了生产件批准的基本要求Purpose of PPAPis to determine if all customer engineering design records and specification requiremen
5、ts are properly understood by the organization 评估组织是否完全理解客户所有的设计和技术要求is to ensure that the manufacturing process has the potential to produce product consistently meeting these requirements during an actual production run at the quoted production rate 保证在确定的产线上有能力生产出稳定的满足客户产品PPAP shall apply to site
6、s supplying:Production and Service parts.PPAP适用于生产件和售后件VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 5Issue date:12/Jul/2023,Security Class:PublicThe 18 PPAP Elements/PPAP的的18项要素项要素1.Design Records2.Engineering Change Documents3.Engineering Approval 4.Design FMEA5.Process Flow Diagrams6.
7、Process FMEA7.Control Plan8.Measurement System Analysis Studies9.Dimensional Results10.Records of Material/Performance Test Results11.Initial Process Studies12.Qualified Laboratory Documentation13.Appearance Approval Report14.Sample Production Parts15.Master Sample16.Checking Aids17.Customer-Specifi
8、c Requirements18.Production Part Approval Process Submission Warrant PSWThe above section numbers are in alignment with the AIAG published PPAP 4th Edition ManualVCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 6Issue date:12/Jul/2023,Security Class:PublicVoice Of the Customer and Specialch
9、aracteristics list客户的呼声和特殊特性Design FMEA设计 FMEAPrototype control plans原型件控制方案Pre-launch control plan试产控制方案Process FMEA过程FMEAProcess flow charts工艺流程图Production control plan量产控制方案Operator instructions作业指导书Documentation flow 文件的流程文件的流程VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 7Issue date
10、:12/Jul/2023,Security Class:PublicWhen is submission of PPAP required?什么时候需要递交什么时候需要递交PPAP is to be submitted for:A new or modified part 任何新的或更改的零件Process or material changes 任何工艺和材料的变更Correction of a deviation to spec on a previously approved part.对之前的临时认可的产品的更正Volume increase or change in supplier
11、 capacity.供给商产能的增加或改变Site Relocation 生产场所的变更Note that:The Supplier must notify VCC using the Supplier Request for Engineering Approval SREA or Supplier request for Industrial Change Approval SRICA 供给商变更需按照沃尔沃“SREA或“SRICA流程进行The Supplier is required to notify the SQM Engineer of any changes after ini
12、tial PPAP approval 有任何初始PPAP批准后发生的变更,供给商必须通知SQMVCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 8Issue date:12/Jul/2023,Security Class:PublicSection 2:VCC Phased PPAP Introduction沃尔沃Phased PPAP介绍Purpose for this Section:VCC phased PPAP VCC阶段PPAPSupplier Roles&Responsibilities 供给商角色和职责Submis
13、sion to Customer+Exception management 递交客户和让步管理流程VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 9Issue date:12/Jul/2023,Security Class:PublicVCC Phased PPAP is a VCC approach to PPAP process management VCC Phased PPAP 是VOLVO管理PPAP流程的方式Introduced to improve launch performance 目的是提高工程启动开发效率
14、Requires a supplier site to demonstrate 要求供给商的现场满足Manufacturing/geometry capability 生产和尺寸稳定的能力Product quality 产品质量And production capacity 产能要求prior to job#1 在job#1之前Is derived from the Ford process but is not equal to it.It is important to ensure that the Volvo Car Corporation version is always used
15、 for Volvo Car Corporation business as both are NOT interchangeable.是从Ford起源但并不相同,所有VCC的供给商必须使用VCC的版本。What is VCC phased PPAP?VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 10Issue date:12/Jul/2023,Security Class:PublicPPAP/VCC PHASED PPAP PARISON 两者比较两者比较VCC Phased PPAP organizes the pro
16、cess into four phasesVCC Phased PPAP把PPAP流程分为四个步骤Phase 0+:Run-at-Rate+geometry 节拍生产和尺寸验证Phase 1:Quality Verification 质量验证Phase 2:Production Verification 生产验证Phase 3:Capacity Verification 产能验证XJob 1TTPPPPAPVCC Phased PPAP RRPhase 0+Phase 1/2 Phase 3VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomi
17、cPage 11Issue date:12/Jul/2023,Security Class:PublicVCC PHASED PPAP TIMING 时间节点时间节点Phase 3Capacity VerificationPhase 0+GeometryverificationPhase 1Quality VerificationPhase 2Production VerificationTT=Tooling Tryout 工装验证 PP=Pilot Production 试生产 MP1=Mass Production 1 量产1 mrd=Material Required Date 产品需求
18、日期 RR Ph0+Ph1/2 Ph3PPAPorderRun-at-RateGeo+capability mrd mrd mrdRRPV testing/AARVCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 12Issue date:12/Jul/2023,Security Class:PublicTiming 时间节点时间节点Specific timing dates for PPAP are set by each program team.VCC工程小组会定义PPAP的详细时间节点Suppliers are requi
19、red to municate planned PPAP timings that supports the program build mrd dates to the responsible Purchaser.供给商与对应的采购沟通,获取能满足工程MRD日期的PPAP时间节点PPAP Phase 0+geo should be submitted by TT mrd Tooling TrialPPAP Phase 1/2 should be submitted by PP mrd Pilot ProductionPPAP Phase 3 should be submitted one w
20、eek prior to MP1 Job#1If the supplier cannot support the sample promise date,the supplier must municate new timing to the Program SQM Engineer 如果供给商不能满足确认的样件递交日期,必须和工程SQM沟通并确定新的节点If the parts are not approved at PP mrd Ph1 the supplier must request a customer approval TPD prior shipment.required by
21、ISO/TS 16949 如果供给商产品没有在试产日期前批准,必须在交货前申请临时认可TPDThe supplier will then support the program with parts shipped with TPD and Interim PSW Approval until PPAP is fully approved.供给商在PPAP完全认可之前,按照临时的TPD和临时PSW交货VCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 13Issue date:12/Jul/2023,Security Class:
22、PublicVCC PHASED PPAP PROCESS MAPPhase 2Production Verification生产验证RunRate for all production streamsQuality Verification for all production streams PPAP Warrant Ph2Phase 1Quality Verification质量验证Continue PPAP using parts from RRParts made during Phase 1 must meet all 18 PPAP Requirements for one pr
23、oduction stream.PPAP Warrant(Ph1)Ph1/2Phase 3Capacity Verification产能验证Normal Weekly Capacity requirements fulfilledPPAP Warrant Ph3Capacity Analysis Report Ph3PPAPorder4-Design FMEA5-Process Flow Diagrams6-Process FMEA7-Control PlansCapacity Analysis Report RRRunRatePhase 0+Geometry Verification尺寸验证
24、 Ph0+1-Design Records4-Design FMEA5-Process Flow Diagrams6-Process FMEA7-Control Plans8-Measurement System Analysis Studies9-Dimensional Results11-Initial Process StudiesPPAP Warrant Ph0+Planned timing for all PPAP phasesPPAP ConfirmationVCC Phased PPAP Process_v2,53200,Andreas Tomic,atomicPage 14Is
25、sue date:12/Jul/2023,Security Class:PublicObjective 目标:Confirm planned timings for all PPAP phases are in line with VCC build/program requirements确定满足工程时间节点的 Phased PPAP的时间节点Required Inputs 要求的输入:Part Folder For Supplier PFFS sent 供给商产品数据包已发放PPAP Confirmation order sent PPAP需求已发放Timing 时间节点:Orders s