(6)--6-Gas Flow Tests with Discrete R气藏工程气藏工程.ppt
《(6)--6-Gas Flow Tests with Discrete R气藏工程气藏工程.ppt》由会员分享,可在线阅读,更多相关《(6)--6-Gas Flow Tests with Discrete R气藏工程气藏工程.ppt(14页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、5.6 Analysis of Gas well Flow Tests-15.6 Analysis of Gas well Flow Tests-1Gas Flow Tests with Discrete Rate Gas Flow Tests with Discrete Rate ChangesChangesGas wells are produced at conditions approximating constant well-head pressure or variable bottom hole rates,rather than at constant bottom-hole
2、 rates,in most gas field operations.In addition,many gas-well tests,especially deliverability tests,are conducted under variable-rate conditions.deliverability testBack pressure testInflow performance Relationship curve(IPR)We concentrate on analysis techniques for variable gas rates,including gas-w
3、ell tests with discrete changes and tests in which the rates are smoothly changing.1 Constant-Rate Gas Flow Tests With constant rate,similar to the analysis of slightly compressible liquids,using adjusted variablesy=mx+b2 Gas Flow Tests with Discrete Rate Changesusing superposition in timeFirst,we c
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 6-6-Gas Flow Tests with Discrete R气藏工程气藏工程 Gas 工程
链接地址:https://www.taowenge.com/p-96637565.html
限制150内