±660kV直流架空输电线路带电作业技术导则—英文版.docx
《±660kV直流架空输电线路带电作业技术导则—英文版.docx》由会员分享,可在线阅读,更多相关《±660kV直流架空输电线路带电作业技术导则—英文版.docx(15页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、F24Record No. 44815-2014DLElectric Power Industry Standard of the Peoples RepubKc of ChinaDL/T 13412014Technical Guide for Live Working on660kV DC Transmission LineIssue Date: March 18, 2014Implementation Date: August 1, 2014Issued by National Energy Administration of the Peoples Republic of Chinase
2、t of electrostatic protective clothing or conductive clothing. If it is necessary to disconnect the directly grounded overhead ground wires from the ground, the overhead ground wires shall be hung with earthing cables before maintenance.5.3.5 Before overhauling in the middle of the overhead ground w
3、ire span, in order to ensure his/her safety, the worker shall check whether the vertical distance between him/her and the live conductors below meets the minimum working distance requirements after the overhead ground wire in the work location is loaded by him/her, and whether the mechanical strengt
4、h of the overhead ground wire meets relevant requirements.5.3.6 When working on the uni-polar power-off side (the other pole is running), the worker shall wear a full set of electrostatic protective clothing or conductive clothing.5.3.7 When using insulating ropes to transfer large metal objects, th
5、e worker at ground potential or on the tower shall ground the metal objects before touching them.5.3.8 With regard to large metal objects (e.g. automobiles, etc.) insulated from the ground and placed near strong electric fields, attention shall be paid to protecting people from induced electrical in
6、jury. The metal objects must be grounded before they can be touched.5.4 Potential transfer5.4.1 The equipotential worker shall obtain permission from the person in charge of the work before potential transfer and shall not lose the protection of the safety belt.5.4.2 For potential transfer of DC tra
7、nsmission lines, the potential rod should be used, which shall be in reliable contact with live conductors. Before entering equipotential, the worker shall contact the potential rod quickly with the live conductors at a distance of about 0.4m from them. When leaving equipotential, the worker shall c
8、ontact the potential rod with the live conductors first, and then withdraw the potential rod quickly after leaving the live conductors 0.4m away.5.4.3 During potential transfer, the action shall be smooth, accurate and fast.6 Enter or leave equipotential1.1 Enter or leave equipotential on a suspensi
9、on tower1.1.1 When entering or leaving equipotential on a suspension tower, the worker shall not enter or leave equipotential vertically from the cross arms or along the insulator strings. The hanging basket (hanging chair and hanging ladder) method, the insulating flexible ladder method and other m
10、ethods may be used to enter and leave equipotential.1.1.2 When the worker enters or leaves equipotential, all the electrical gap distances (including the working distances and the combined gaps) between the worker and the earthing conductors and the live conductors shall meet the requirements of Tab
11、les 3 and Table 4.1.1.3 The hanging baskets (hanging chairs and hanging ladders) shall be stably suspended by insulating slings, and the moving speed shall be strictly controlled by insulating pulley sets to achieve a uniform and slow speed. The length of the insulating slings for fixing shall be ac
12、curately calculated or actually measured to ensure that the highest part of the human body shall not exceed the upper edge of the grading ring on the conductor side when the worker enters or leaves equipotential.1.2 Enter or leave equipotential on a tension tower1.2.1 When entering or leaving equipo
13、tential on a tension tower, the worker may enter or leave equipotential along horizontal tension insulator strings or via other methods.1.2.2 When the worker moves along the horizontal tension insulator strings, the positions of his/her hands and feet must be kept consistent, and the number of good
14、insulators short-circuited by the human body and tools shall meet the requirements of Table 5.1.2.3 The workers safety protection rope shall be tied to the insulator string held by his/her hands and shall move synchronously with him/her.1.2.4 When entering or leaving equipotential, the worker shall
15、transfer potential when moving to a distance of about 0.4m (2 3 insulators) from the live conductors before carrying out subsequent operations.1.2.5 All the electrical gap distances (including the working distances and the combined gaps) between the worker and the earthing conductors and the live co
16、nductors, and the number of good insulators short-circuited by the human body or tools shall meet the requirements of Table 5.7 Matters needing attention at work7.1 The workers shall avoid excessive body movements during live working.7.2 Insulating tools shall be used to transfer articles between th
17、e equipotential worker and the ground potential worker. The effective length of the insulating tools shall meet the requirements of Table 2.7.3 The conductive clothing shall be free from damage and holes, and all parts of it shall be connected well and reliably. When damage and burrs are found, it s
18、hall be repaired in time, and it can be used only after passing the test.7.4 Before the insulating tools are used, an insulation resistance tester shall be used to conduct segmented insulation tests. The width of the measuring electrodes is 2cm, and it is required that the insulation resistance betw
19、een every 2cm of measuring electrodes shall not be less than 700MQ.7.5 The insulating tools shall be protected from moisture and surface damage and dirt when used. The insulating tools to be used shall be placed on clean, dry and moisture-proof pads. When found dampened or surface-damaged or surface
20、-dirty, they shall be handled in time and can be used only after passing the test.7.6 During the work, bearing tools shall be fixed and reliable and have backup protection.7.7 If deteriorated or low resistance insulators are found during live testing of insulators, they shall be retested 2-3 times t
21、o avoid misjudgment.7.8 When the first insulator near the cross arm is dismantled or installed, it must be short-circuited before operation.8 Test of tools, devices and equipment8.1 The design of live working tools, devices and equipment shall conform to the requirements of GB/T 18037.Conductive clo
22、thing, insulating ropes, insulating rods, insulator holders, etc., shall pass type tests and leaving factory tests in accordance with the requirements of GB/T 6568, GB/T 13035, GB 13398, DL/T 463, DL/T 878.8.2 The tools, devices and equipment shall be subjected to electrical tests and mechanical tes
23、ts on a regular basis according to the test methods of DL/T 976. The test cycles are as follows:a) electrical tests. Preventive tests shall be conducted once a year, and inspection tests shall be conducted once a year, and the interval between two tests shall be half a year.b) mechanical tests. Prev
24、entive tests shall be conducted once every two years for insulating tools and once every year for metal tools.8.3 Preventive tests8.3.1 DC withstand voltage test: the insulation length of the test sample between the test electrodes shall be 4.8m; the withstand voltage shall be 755kV; the time shall