1、主讲人:主讲人:徐西雨徐西雨 关清源关清源 孟孟 康康 杜文旺杜文旺第1页Part 1 Warm-up Activties1.Assembly sequence of a prefabricated building.按次序装配预制建筑。按次序装配预制建筑。The sequence is divided into four stages or phases:这个次序划分为四个阶段或部分:这个次序划分为四个阶段或部分:Ground is excavated挖掘地基Concrete foundations are constructed混凝土基础结构Column base plates are f
2、ixed柱形基础板固定Steel columns are erected树立钢柱Phase 1第2页 First,the ground is excavated.Then,the concrete foundations are constructed.Later,the column base plates are fixed.Finally,the steel columns are erected.首先,挖掘地基。然后,搭建混凝土基础结构。之后,确定柱形基础板。最终,树立钢柱。Phase 2Roof decking is put in place屋顶装饰Upper floor steel
3、 columns are erected楼上树立钢柱Concrete floor slabs are put in place浇制混凝土楼板Beams and bracing are fixed固定梁和支撑结构 Now look at the drawings of the next three stages and make statements about the sequence of events in phases 2,3 and 4.现在看看接下来三个阶段图纸和在2,3,4部分关于项目次序说明。第3页Weatherproof roof membrane is laid铺设防风雨屋顶
4、防水层Balustrade fixing plates are fixed固定栏杆固定板Comer units are erected树立边角构件Horizontal cladding panels are fixed固定水平电镀板Vertical cladding panels are fixed固定垂直覆盖层板 Suspended ceilings are fixed固定吊顶Partitions are erected划分区域Services are installed in the ceiling void在吊顶空间安装服务Floor finishes are laid铺设地板Build
5、ing is decorated建筑装饰Phase 3Phase 4第4页3.Identify the part of the building or the phase of assembly sequence described in these sentences:确定建筑物一部分或这些句子中描述装配次序阶段:确定建筑物一部分或这些句子中描述装配次序阶段:a)This cannot be put in place until the upper floor steel columns have been erected.这个不能到位,知道楼上树立好钢柱。b)Before fixing t
6、hese,the workmen erect the corner units.在处理这些之前,工人们建造角落单位。c)During this phase the beams and bracing are fixed.在这个阶段,梁和支撑是固定。d)The workmen fix these after constructing the concrete foundations.工人们将在之后浇筑混凝土基础。e)The electric wiring is installed during this phase.在这个阶段安装电线。f)When the balustrade fixing p
7、lates have fixed,the workmen can start laying this.在栏杆固定杆固定后,工人们开始铺设。第5页Part 2 Controlled1.Look at this time schedule of a building project:看一个建筑项目时间表:第6页50%32%18%1.foreman工头工头-supervision监督管理监督管理2.labourers劳工劳工-doing manual work做体力劳动做体力劳动3.machine drivers机械工人机械工人-excavating ground挖掘土地挖掘土地4.steel er
8、ectors钢结构安装工钢结构安装工-erecting steelwork安装钢结构安装钢结构5.bricklayers砖瓦匠砖瓦匠-building brickwork砌筑砖墙砌筑砖墙6.plumbers水管工水管工-installation of pipework and sanitary fittings 管道工程与洁具安装管道工程与洁具安装7.joiners连接工连接工-manufacture of doors,windows,screens 制作门,窗,屏幕等制作门,窗,屏幕等8.carpenters木匠木匠-fixing of floor joists,roof timbers,d
9、oors,windows 安装地板托梁,屋顶木材,门,窗等安装地板托梁,屋顶木材,门,窗等9.roofing contractor屋面承包方屋面承包方-laying roof covering铺设屋面覆盖层铺设屋面覆盖层10.cladding fixers包层调停者包层调停者-fixing cladding固定维修包层固定维修包层11.heating contractor加热承包商加热承包商-installation of heating equipment 安装加热设备安装加热设备12.electricians电工电工-installation of electrical equipment
10、电气设备安装电气设备安装13.glaziers装玻璃工人装玻璃工人-putting in glazing安装玻璃安装玻璃14.decorators室内装潢师室内装潢师-decorating building建筑装潢建筑装潢相关词汇:相关词汇:第7页Manager经理经理Project manager项目经理项目经理Resident construction manager驻工地总代表驻工地总代表Construction superintendent工工地主任地主任Controller staff member管理员,管理员,职员职员Engineer工程师工程师Technician技术员技术员E
11、conomist经济员经济员Supervisor检验员检验员Foreman工长工长Worker工人工人Civil engineering土建工程土建工程Chemical engineering化工工程化工工程Process工艺工艺Mechanical equipment机械设备机械设备Electrical电气电气Instrumentation仪表仪表Piping管道管道Welding焊接焊接Furnace筑炉筑炉Building建筑建筑Corrosion prevention防腐防腐Thermal-insulation保温保温Heating-ventilation采暖通风采暖通风Quality
12、 control质量管理质量管理第8页Mechanic机械工机械工Electrician电工电工Pipelayer管工管工Welder焊工焊工Carpenter木工木工Turner车工车工Blacksmith铁工铁工Builder建筑工人建筑工人Erector安装工人安装工人Riveter铆工铆工Rigger起重工起重工Concrete worker混凝土工混凝土工Engine-driver司机司机Repair worker维修工维修工Piling打桩打桩Civil engineering土建工程土建工程Mechanical erection机械安装机械安装Piping配管配管Electric
13、al电气电气Instrumentation仪表仪表Painting and insulation work油漆和保温绝缘工作油漆和保温绝缘工作第9页Cracker裂解器裂解器Cracking furnace裂解炉裂解炉Heating furnace加热炉加热炉Reactor反应器反应器Mixer搅拌器搅拌器Centrifuge离心机离心机Belt-conveyer皮带输送机皮带输送机Cooler冷凝器冷凝器Condenser冷凝器冷凝器Separator分离器分离器Boiler锅炉锅炉Generator发生器发生器Scrubber洗涤器洗涤器Stripper汽提器汽提器Heat exchang
14、er热交换器热交换器Installing安装安装Checking检验检验Aligning找正找正Leveling找平找平Purging清洗清洗第10页Site labor(网站劳动网站劳动)The two most important men on a construction site are the contractors agent and the navy.在建筑工地最主要两个人物是承包者代理人和工人。The agent is important because he acts for the contractor and has the authority of the contra
15、ctor on the site.代理很主要,因为他对承包商行为含有对网站权威。The navy is important because he,with perhaps hundreds of other navies,does most of the work.工人工作很主要是因为他们可能要作大部分工作。Compared with these two,although no civil engineer will happily admit it,the resident engineer comes third,for without him the work would be comp
16、leted in time,though perhaps badly and at high cost to the client.相比这两个,即使公务员工程师不会意认可它,驻地工程师排为第三,不过没有他工作不会及时完成,而且会花费成本很高。Part 5 Extensive Reading关第11页Most of the civil engineering design has been done by the time the contract has been signed,and the contractor is bound by to follow the design as it
17、is laid down in the drawings,though normally no contract is left without the supervision of a resident engineer or at least of a clerk of the works or a civil engineering inspector.最主要土木工程设计已完成,协议已经签署,和承包商势必按照设计图纸,要求即使通常没有协议没有监管驻地工程师不过最少有名文员工程或土建工程督察。Between the agent and the navy there are many oth
18、er men who organize the work,help it to go smoothly,see to the arrival of the essential materials,check their quality and help to get the contract finished on time.代理和工人之间有许多其它人安排工作来帮助它顺利进行,等到材料到来,检验它们质量而且帮助按时完成协议。第12页The chief of these is the general foreman,a man who has worked for many years on c
19、onstruction sites,either as a navy and then as a ganger in charge of a group(gang)of navies,or more usually,as a tradesman and then a foreman of his trade.这些主要是普通工头,待在建筑工程很多年,不论是掌管一个团体领班,或者更经常是作为一个贸易商。“Tradesman”in civil engineering or building is the name given to masons,bricklayers,carpenters,plas
20、terers,mechanical fitters and others who do a special kind of work with their hands(a trade).土木工程或建设中商人是工作给泥瓦匠、泥瓦匠、木匠、泥水匠、机械钳工和他人做一个特殊称呼,用他们双手进行贸易名称。第13页 The critical trade in civil engineering is usually carpentry because the carpenters build the concrete formwork,and the foreman carpenter sets out
21、 the formwork for them and often also sets out for the other trades.土建工程关键贸易通常是木工,因为木匠建造混凝土模板,木工经常为自己或者其它行业设置了模板。If the setting out is not well ahead of its time,the concrete formwork is likely to be delayed,with serious consequences for the progress of the job.假如设置了不使他们提前,混凝土模板很可能收到延误,对作业进度会造成严重后果。
22、Setting out means marking out the work on the ground or on the structure,to ensure that it is properly placed.假如设置了不使他们提前,混凝土模板很可能收到延误,对作业进度会造成严重后果。A civil engineer usually sets out the main location of the building,and ties it in with his surveying instruments to local survey monuments.设定出装置标示出在地面上